Free report · Generated Nov 28, 2026 · tailcheck.me/intel/N129AR/stcs

STCs · AGUSTA SPA A109E

N129AR · 2001 AGUSTA SPA A109E · Serial 11125

The same list for every AGUSTA SPA A109E. Matched on maker and model.

An STC listed here can be installed on this model; whether one is installed on this aircraft is recorded in its logbooks and Form 337s.

75 STCs

  1. SR01829NY · Installation of a FLIR System7500 or 8000 Airborne Imaging System.

    Holder
    Leonardo Helicopters US Corporation
    Status date
  2. SR01943NY · Installation of an Enhanced Ground Proximity Warning System (EGPWS).

    Holder
    Leonardo Helicopters US Corporation
    Status date
  3. SR02150NY · Installation of an Enhanced Vision System (EVS-1000).

    Holder
    Leonardo Helicopters US Corporation
    Status date
  4. SR02752NY · Installation of a Garmin GNS430W System

    Holder
    Leonardo Helicopters US Corporation
    Status date
  5. SR03138NY · Revised the low limit of the normal operating envelope of the rotorcraft for cold weather operation to allow operation at minimum ambient air temperature of -35 C (-31 F)

    Holder
    Leonardo Helicopters US Corporation
    Status date
  6. SR04842NY · Installation of RMCI Inc. Expandable Rotorcraft Diagnostic System (XRDS)

    Holder
    Sterling Helicopter
    Status date
  7. SR00824DE · Installation of an Emergency Medical Services Interior and alternate cabin seating interior configurations

    Holder
    AMS Heli Design
    Status date
  8. SR04195CH · Installation of Heli-Preheat Kit, P/N TA3134-1 for 115-volt application

    Holder
    Hartzell Propeller LLC
    Status date
  9. SR00182IB · Installation of the Avidyne Integrated Flight Display (IFD) Navigator(s)

    Holder
    Horizon Design Services Ltd.
    Status date
  10. SH3319NM · Installation of Precise Flight Pulselite Control Unit in the Landing /Taxi Recognition Visual Control Light system,

    Holder
    Precise Flight Inc
    Status date
  11. SR04557AT · Cabin and crew floor protector installations

    Holder
    Helifab East LLC
    Status date
  12. SR00084IB · Installation of Alternative Inflation System for Emergency Flotation System

    Holder
    SAAB AKTIEBOLAG
    Status date
  13. SR01456LA · Installation of Concorde RG407 Batteries

    Holder
    Rotorcraft Support Inc
    Status date
  14. SR02704SE · Installation and maintenance of the Sunspot 36 and 46 series lights

    Holder
    AeroLED's Holdings LLC
    Status date
  15. SR01970NY-D · Installation of a Honeywell Chadwick Model 15175 VXP System.

    Holder
    Diagnostic Solution International LLC
    Status date
  16. SR01052DE · Installation of Non-Aviation Band FM Radio Systems

    Holder
    Cert Works LLC
    Status date
  17. SR01476SE · Installation of a Supplemental Lighting System.

    Holder
    Aviation Specialties Unlimited Inc.
    Status date
  18. SR04453CH · Installation of Appareo Systems LLC Stratus ES & Stratus ESG ADS-B transponder

    Holder
    Appareo Systems LLC
    Status date
  19. SR02124SE · Installation functionality. of Data Garmin Required: transponders: (1) Garmin GTX Master 345/345R Drawing with List ADS-B (MDL), Out and In 005-00734-A4, functionality;

    Holder
    Garmin International Inc
    Status date
  20. SR04390CH · Installation of an Electronic Flight Instrument System (EFIS) in accordance with StandardAero Master Data List 1036284, Revision (B), dated June 5, 2019 or later FAA approved revision.

    Holder
    StandardAero Business Aviation Services LLC
    Status date
  21. SR00359BO · Installation of Parmetheus Plus LED PAR36 and PAR46 taxi and landing lights.

    Holder
    Whelen Aerospace Technologies
    Status date
  22. SR01525NY · Installation of an Emergency Medical System (EMS).

    Holder
    LifePort LLC
    Status date
  23. SR01816LA · Installation of a Medical Stretcher.

    Holder
    LifePort LLC
    Status date
  24. SR01865LA · Installation of an Emergency Medical Rescue Stretcher.

    Holder
    LifePort LLC
    Status date
  25. SR00814DE · Installation of Garmin Helicopter Terrain Awareness and Warning System (HTAWS)

    Holder
    Cert Works LLC
    Status date
  26. SR01812LA · Installation of Apical Industries, Inc. Emergency Float Kit.

    Holder
    Apical Industries Inc. dba Dart Aerospace
    Status date
  27. SR02257CH · Install air ambulance conversion

    Holder
    Snaky Creek Enterprises LLC dba Spectrum Aeromed
    Status date
  28. SR02894CH · Install EMS ITS Deck with the Factory EMS Interior

    Holder
    Spectrum Aeromed LLC dba Spectrum Aeromed
    Status date
  29. SR00828DE · Installation of Automatic Dependent Surveillance Broadcast (ADS-B) Out functionality using the Garmin G330ES or G33H ES Transponder and qualified position sensor

    Holder
    Peregrine
    Status date
  30. SR02258SE · Installation of a tail rotor pedal lockout kit

    Holder
    Dart Aerospace USA Inc.
    Status date
  31. SR02377AK · Installation of a fixed mounted Max-Viz Enhanced Vision System (EVS) Model 1500 to include a sensor Line Replaceable Unit (LRU) with conformal housing, power supply, Detached Electrical Box (DEB) and a glareshield-mounted, dedicated display monitor.

    Holder
    Avio Design Group Inc
    Status date
  32. SR00860DE · Installation of Teledyne Battery Products Valve-Regulated Lead-Acid

    Holder
    Teledyne Battery Products
    Status date
  33. SR03055CH · Installation of Flight Data Monitoring System

    Holder
    MSP Aero LLC
    Status date
  34. SR00812DE · Installation of Honeywell Sky Connect Tracker III system

    Holder
    Cert Works LLC
    Status date
  35. SR02988CH · Installation of Inlet Barrier Filter system in accordance with Aerospace Filtration Systems, Inc. Drawing 124001-010, Revision C, dated May 26, 2011, or later FAA approved revision.

    Holder
    Donaldson Company Inc.
    Status date
  36. SR02487AK · Installation of L-3 Communications Avionics Systems ESI-500 Standby Instrument System

    Holder
    ADS-B Technologies, LLC
    Status date
  37. SR00856DE · Certification of Honeywell MK XXI Helicotper Terrain Awareness and Warning System

    Holder
    Cert Works LLC
    Status date
  38. SR00060DE · Installation of Belt-Driven Vapor Cycle Air Conditioning System Kit P/N A109-00-011 with dual condenser blower configuration

    Holder
    RSG Products Inc
    Status date
  39. SR09438RC · Installation of Night Vision Goggle Compatible Lighting System.

    Holder
    Aero Dynamix Inc.
    Status date
  40. SR02394AK · Replacement of existing landing and/or hover light bulbs with Light Emitting Diode (LED) lighting system

    Holder
    Seaplanes North LLC
    Status date
  41. SR01124NY-D · Installation of an Aeromedical Liquid Oxygen System.

    Holder
    Sikorsky Aircraft Corporation
    Status date
  42. SR03478NY · Modification of EMS interior to allow primary litter to be installed diagonally across the cabin

    Holder
    AgustaWestland Philadelphia Corporation
    Status date
  43. SH4676SW · Installation of Tail Rotor Floodlights on the upper surface of the horizontal stabilizer

    Holder
    DeVore Aviation Corporation of America, a New Mexico Corporation
    Status date
  44. SR09360RC · Installation of Concorde Battery Model RG-407, Valve regulated sealed lead acid battery.

    Holder
    Concorde Battery Corporation
    Status date
  45. SR02139SE · Fabrication of Onboard Systems Model 200-355-00 and 200-369-00 Cargo Hook Fixed Provision Kits, Model 200-356-00 Cargo Hook Suspension Kit, and Model 200-357-00 Load Weigh Kit, in accordance with FAA Approved Onboard Systems Master Drawing List No. 155-160-00, Revision 2, dated September 27, 2011, or later FAA approved revision. Installation of the Onboard Systems Model 200-355-00, 200-356-00, 200-357-00, or 200-369-00 kits in accordance with FAA approved Onboard Systems Owners Manual 120-141-00, Revision 0, dated April 25, 2011, or later FAA approved revision. This modification must be inspected and maintained in accordance with section ATA 5 of FAA approved Onboard Systems Instructions for Continued Airworthiness Document 123-036-00, Revision 0, dated May 5, 2011, or later FAA approved revision, and Onboard Systems Cargo Hook

    Holder
    Onboard Systems International
    Status date
  46. SR02232LA · Installation of Garmin Model 400W / 500W Series GPS-WAAS Navigation System

    Holder
    Garmin AT Inc.
    Status date
  47. SR01963AT · Manufacture of Replacement Windshields.

    Holder
    Bell Helicopter Textron Inc.
    Status date
  48. SH1190EA · Installation of Aircraft Parts Corp. (APC) starter-generator, P/N 150SG1110.

    Holder
    Skurka Aerospace Inc.
    Status date
  49. SR02709NY · Installation of a Honeywell EVXP Health and Use Monitoring System (HUMS) and Helicopter Operations Monitoring Program (HOM) on an Agusta A109E Helicopter.

    Holder
    Agusta Aerospace Corporation
    Status date
  50. SR00677DE · Installation of fixed receivers for ground handling blade folding kit.

    Holder
    Paravion Technology Inc
    Status date
  51. SR02189NY · Iinstallation of SkyTrac ISAT-100 Airborne Position/Data Communicator System.

    Holder
    SkyTrac Systems Ltd.
    Status date
  52. SR01905SE · ONE ONLY STC, SN 7606: Installation of a Supplemental Lighting System.

    Holder
    Aviation Specialties Unlimited Inc.
    Status date
  53. SR01906SE · ONE ONLY STC, SN 7153: Installation of a Supplemental Lighting System

    Holder
    Aviation Specialties Unlimited Inc.
    Status date
  54. SR01901SE · ONE ONLY STC, SN 7185: Installation of a Supplemental Lighting System.

    Holder
    Aviation Specialties Unlimited Inc.
    Status date
  55. SR01902SE · ONE ONLY STC, S/N 7205: Installation of a Supplemental Lighting System

    Holder
    Aviation Specialties Unlimited Inc.
    Status date
  56. SR01904SE · ONE ONLY STC, SN 7155: Installation of a Supplemental Lighting System

    Holder
    Aviation Specialties Unlimited Inc.
    Status date
  57. SR00227BO · Installation of Altair Avionics Corporation Digital Aircraft Data Acquisition System ADASd

    Holder
    Pratt & Whitney Engine Services Inc.
    Status date
  58. SR00232BO · Installation of Pratt & Whitney Engine Services, Inc. Data Transmission Unit (DTU).

    Holder
    Pratt & Whitney Engine Services Inc.
    Status date
  59. SR09475RC · Installation of Tinted Window Shades

    Holder
    Heritage Aviation Ltd
    Status date
  60. SR01577NY · Installation of a Spectrolab SX-5 Search Light System.

    Holder
    Leonardo Helicopters US Corporation
    Status date
  61. SH3754SW · Installation of DeVore forward facing recognition lights.

    Holder
    DeVore Aviation Corporation of America, a New Mexico Corporation
    Status date
  62. SR01848NY · Increase in maximum takeoff weight from 2850 Kg to 3000 Kg.

    Holder
    Agusta Aerospace Corporation
    Status date
  63. SR01676NY · Installation of an Aft Contollable Searchlight.

    Holder
    Leonardo Helicopters US Corporation
    Status date
  64. SH3533NM · Cockpit sun visor installation.

    Holder
    Rosen Sunvisor Systems LLC
    Status date
  65. SH3811NM · Install a combination attendant seat and patient litter kit assembly.

    Holder
    Aero Credit Company Inc
    Status date
  66. SR01844AT · Installation of Tail Rotor Pedal Lockout Kit.

    Holder
    Bell Helicopter Textron Inc.
    Status date
  67. SR01215NY · Installation of Honeywell EFIS-50 Electronic Flight Instrument System.

    Holder
    Agusta Aerospace Corporation
    Status date
  68. SR00981NY · The installation of a support for a secondary litter.

    Holder
    Agusta Aerospace Corporation
    Status date
  69. SR00980NY · Installation of a Sound Reduction Wall Panel System.

    Holder
    Advanced Flight System, Inc
    Status date
  70. SH638NE · Installation of Parker Model 2C35-3 fuel tank mounted auxiliary fuel boost pumps to be used interchangeably with the standard Agusta P/N 109-0611-53-1 electric fuel pumps.

    Holder
    Parker Hannifin Corp
    Status date
  71. SR09200RC · Installation of a rotor dynamics americas, inc RDA 3303 airborne vibration Monitoring system.

    Holder
    Rotor Dynamics Americas
    Status date
  72. SR00815NY · Installation of Oxygen Supply Stem for Emergency Medical Service (EMS) Interior.

    Holder
    Advanced Flight System, Inc
    Status date
  73. SH359NE · Installation of advanced vapor cycle air conditioning system.

    Holder
    Advanced Flight System, Inc
    Status date
  74. SH448NE · Installation of Bendix Model MLS-20A microwave landing system.

    Holder
    MSI
    Status date
  75. SH163NE · Installation of emergency medical service quick change kit.

    Holder
    Agusta Aviation Corporation
    Status date

Sources

Search STCs in FAA DRS

Source: FAA Dynamic Regulatory System, as of Nov 23, 2026.