Free report · Generated Nov 29, 2026 · tailcheck.me/intel/N214HM/stcs

STCs · BELL 214B-1

N214HM · 1981 BELL 214B-1 · Serial 28065

The same list for every BELL 214B-1. Matched on maker and model.

An STC listed here can be installed on this model; whether one is installed on this aircraft is recorded in its logbooks and Form 337s.

72 STCs

  1. SR02484SE · Installation of ISOLAIR Fire Fighting System 4600-214B

    Holder
    McDermott Aviation 214 Holdings, LLC
    Status date
  2. SR02611SE · Installation of a High Skid Cross Tube Landing Gear

    Holder
    McDermott Aviation 214 Holdings, LLC
    Status date
  3. SR02270SE · Fabrication and installation of Geneva Aviation Audio System

    Holder
    AEM USA Inc.
    Status date
  4. SR02444SE · Installation of P178 Failsafe Audio Mixer

    Holder
    AEM USA Inc.
    Status date
  5. SR04465NY · Installation of the iPad Mount

    Holder
    Avio Design Group Inc
    Status date
  6. SR00213IB · Modification of Swashplate Inner Ring Assembly

    Holder
    McDermott Aviation Ltd.
    Status date
  7. SR00145IB · Installation of LH and RH Vertical Reference Door(s)

    Holder
    Transwest Helicopters Ltd.
    Status date
  8. SR02491AK · Reduction / Limitation of passenger seats to nine (9) or less

    Holder
    WSH, LLC
    Status date
  9. SH3319NM · Installation of Precise Flight Pulselite Control Unit in the Landing /Taxi Recognition Visual Control Light system,

    Holder
    Precise Flight Inc
    Status date
  10. SH400NW · Installation of left hand bubble door with or without duplicate engine instruments

    Holder
    WSH, LLC
    Status date
  11. SR04772NY · Manufacturing and Installation of Legacy Helicopter Maintenance (LHM) Improved Transmission Spindle

    Holder
    Legacy Helicopter Maintenance Ltd
    Status date
  12. SR01903NY · Installation of a modified co-pilot seat.

    Holder
    Transwest Helicopters Ltd
    Status date
  13. SR00408SE · Fabrication of Onboard Systems Model E-62 Cargo Hook Load Weigh System

    Holder
    Onboard Systems International LLC
    Status date
  14. SR04588NY · Replacement Cabin Floor Panels

    Holder
    Trinity Aviation Services Limited
    Status date
  15. SR04517NY · The Forward and Aft Crew Door Rod Assembly Replacement

    Holder
    Transwest Helicopters Ltd
    Status date
  16. SR04403NY · Installation of the Trig Avionics TT22 ADS-B Transponder System

    Holder
    Maxcraft Avionics Ltd.
    Status date
  17. SR04404NY · Installation of the Trig Avionics TY92 VHF Communications System

    Holder
    Maxcraft Avionics Ltd.
    Status date
  18. SR04357NY · Installation of Modified Elevator Horn

    Holder
    McDermott Aviation Ltd.
    Status date
  19. SR04358NY · Installation of Cargo Hook Modification

    Holder
    Legacy Helicopter Maintenance Ltd
    Status date
  20. SR00939NY · Installation of Vertical Reference Door with left seat operation provisions.

    Holder
    Dart Aerospace Ltd.
    Status date
  21. SR00957NY · Installation of external cargo hook release system for co-pilot position.

    Holder
    Dart Aerospace Ltd.
    Status date
  22. SR01446NY · Installation of Serviceability Kit: Auxiliary cowl latches, cockpit door wear pads and cabin door handle.

    Holder
    Dart Aerospace Ltd.
    Status date
  23. SR02094NY · Installation of GPS Receiver and Gimbal Mount System.

    Holder
    Dart Aerospace Ltd.
    Status date
  24. SR04118NY · Installation of Transmission Restraint Replacement

    Holder
    McDermott Aviation Ltd
    Status date
  25. SR02772NY · Installation of Bear Paw kits

    Holder
    Alpine Aerotech LP
    Status date
  26. SR02868NY · Installation of Exterior Door Handle Kits

    Holder
    Alpine Aerotech LP
    Status date
  27. SR02413LA · Installation of an AKV, Inc Exceedence and Trend Monitoring System kit P/N ETM1000

    Holder
    AKV Inc.
    Status date
  28. SR02289LA · Installation of Apical Industries, Inc. Cable Cutters Kit.

    Holder
    Apical Industries, Inc. dba Dart Aerospace
    Status date
  29. ST04270AT · Install the VTOL ASSALT V3 Windscreen Laminate Kit

    Holder
    VTOL LLC
    Status date
  30. SR02407SE · Installation of Geneva Aviation 28 - 14 VDC Power Converter

    Holder
    AEM USA Inc.
    Status date
  31. SR00798DE · Installation of Torque Meter Junction Box Relocation

    Holder
    Erickson Incorporated
    Status date
  32. SR03371CH · Installation of NASI Supplemental Air Conditioning Module

    Holder
    National Aircraft Service Inc
    Status date
  33. SR02707NY · Installation of Marathon PC-251 or KGS SPC-10 Solid State Inverters

    Holder
    Rilpa Enterprises, Ltd
    Status date
  34. SR01742NY · Installation of extended height landing gear.

    Holder
    Dart Aerospace Limited
    Status date
  35. SR03339NY · Installation of Latitude Technologies IONODE Flight Data Monitoring System

    Holder
    Latitude Technologies Corporation
    Status date
  36. SR02843NY · Installation of Sliding Door Pop Out Windows

    Holder
    Alpine Aerotech LP
    Status date
  37. SR03044NY · Installation of Skid Tube Rub Strips

    Holder
    Alpine Aerotech Ltd
    Status date
  38. SH261WE · Installation of an external load attachment mechanism in accordance with FAA Approved USDA Forest Service Master Drawing List and Rotorcraft Flight Manual Supplements, per Approved Model List SH261WE, and all subsequent FAA approved revisions to these documents.

    Holder
    USDA Forest Service
    Status date
  39. SH3722NM · Installation of closed circuit refueling reciever P/N 750000-5.

    Holder
    H R Textron Inc
    Status date
  40. SA2693NM · Installation of Electronics International digital volt/amp gauges and accessories.

    Holder
    Electronics International Inc.
    Status date
  41. SR02692NY · Installation of Protective Trim Kits

    Holder
    Dart Aerospace Limited
    Status date
  42. SR02683NY · The installation of the SkyTrax3 Asset Tracking System must be performed

    Holder
    GMC Guardian Mobility Corporation
    Status date
  43. SH464NW · Incorporation of a weighing system for external load operations.

    Holder
    Measurement Systems Intl Inc
    Status date
  44. SR01298NY · Installation of replacement crosstubes P/N D212-664.

    Holder
    Dart Aerospace Limited
    Status date
  45. SR00563NY · Installation of Skidtubes and associated saddles

    Holder
    Dart Aerospace Limited
    Status date
  46. SH2778NM · Removal passenger seats

    Holder
    Air Methods Corporation
    Status date
  47. SR00571NY · Installation of Bearpaws.

    Holder
    Dart Aerospace Limited
    Status date
  48. SH975NE · Installation of Dart Aerospace Ltd. Cargo Mirror in accordance with FAA Approved Model List (AML) SH975NE

    Holder
    Dart Aerospace Limited
    Status date
  49. SR02475NY · The installation of Skynode S200-xxx Satellite Communication Equipment to be done

    Holder
    Latitude Technologies Corporation
    Status date
  50. SR00696NY · Installation of external utility basket.

    Holder
    Dart Aerospace Limited
    Status date
  51. SR00597NY · Installation of folding cabin step.

    Holder
    Dart Aerospace Limited
    Status date
  52. SR01997NY · Manufacture of Shoulder Harness Kits.

    Holder
    Dart Aerospace Limited
    Status date
  53. SA00680SE · Installation of Electronics International model UBG-16 or UBG-16T bar graph engine analyzer.

    Holder
    Electronics International
    Status date
  54. ST02134NY · Installation of a Concorde RG0380 Sealed Lead Acid Battery

    Holder
    Transwest Helicopters Ltd
    Status date
  55. SR02091NY · Installation of a D212-722 avionics riser console in the cockpit as a replacement for the center console.

    Holder
    Dart Aerospace Limited
    Status date
  56. SR02086NY · Installation of a Spacedoor.

    Holder
    Dart Aerospace Limited
    Status date
  57. SR01787LA · Installation of Nine Passenger Or Less Seating.

    Holder
    Helimax Aviation Inc
    Status date
  58. SR02058NY · The installation of replacement window kits in accordance with Dart Aerospace Ltd. Installation Instructions IIN-D412-709, Rev. A dated December 5, 2003 on Bell models 205A, 205A-1, 205B, 212, 412, 412CF, 412EP, 214B and 214B-1 aircraft.

    Holder
    Dart Aerospace Limited
    Status date
  59. SR02055NY · Installation of Fuel Purge Canister to be done in accordance with Transport Canada approved DART Aerospace Ltd. Installation Instructions, IIN-D412-706, Revision A, dated November 30, 2004, or later Transport Canada approved revision.

    Holder
    Dart Aerospace Limited
    Status date
  60. SH46NW · Installation of an electronic weighing system, for monitoring cargo hook weight, in accordance with Measurement Systems International, Inc., Installation drawing No. D00409, Rev. A, or Drawing D00471, Rev. IR.

    Holder
    Measurement Systems Intl Inc
    Status date
  61. SR00811NY · Installation of Technisonic Industries Limited TFM-138 series transceiver models.

    Holder
    Technisonic Industries Limited
    Status date
  62. SR01834NY · Installation of Globalstar Satellite Telephone System.

    Holder
    Atlantic Avionics Inc.
    Status date
  63. SR00592NY · Installation of Dart Aerospace fixed step.

    Holder
    Dart Aerospace Limited
    Status date
  64. SR00488DE · Reconfigure aircraft to a maximum seating of 9 passengers.

    Holder
    Central Copters Inc.
    Status date
  65. SR00513NY · Installation of HeliRappel.

    Holder
    Dart Aerospace Limited
    Status date
  66. SH897NE · Installation of passenger access step.

    Holder
    Dart Aerospace Limited
    Status date
  67. SA1626NM · Installation of Electronics Int'l Digital EGT/CHT Instruments and accessories. (201 Series)

    Holder
    Electronics International
    Status date
  68. SA4302NM · Installation of Electronics Int'l digital automatic engine analyzer.

    Holder
    Electronics International
    Status date
  69. SH4331NM · Installing a Model 7700 Modular Electrical System.

    Holder
    Simplex Manufacturing Company
    Status date
  70. SA2662NM · Installation of a Simples Model7300 spray system.

    Holder
    Simplex Manufacturing Company
    Status date
  71. SH480NW · Installation of a left front Perkins Plastic bubble door

    Holder
    Croman Corporation
    Status date
  72. SH2298SW · Interior arrangement and installation.

    Holder
    Associated Air Center
    Status date

Sources

Search STCs in FAA DRS

Source: FAA Dynamic Regulatory System, as of Nov 23, 2026.