Free report · Generated Nov 29, 2026 · tailcheck.me/intel/N29KH/stcs
STCs · BELL 222
N29KH · 1981 BELL 222 · Serial 47053
The same list for every BELL 222. Matched on maker and model.
An STC listed here can be installed on this model; whether one is installed on this aircraft is recorded in its logbooks and Form 337s.
88 STCs
SR00149DE-D · Installation of an Air Methods tail stinger attachment modification.
- Holder
- Air Methods LLC
- Status date
SR00185DE · Installation of medical interior air transport unit for S/N 47060 only
- Holder
- Air Methods LLC
- Status date
SR00235DE-D · Installation of an Articulating Patient Loading System (APLS).
- Holder
- Air Methods LLC
- Status date
SH3319NM · Installation of Precise Flight Pulselite Control Unit in the Landing /Taxi Recognition Visual Control Light system,
- Holder
- Precise Flight Inc
- Status date
SH4793NM · Fabrication of Onboard Systems Model E-73 Cargo Hook Load Cell System
- Holder
- Onboard Systems International
- Status date
SR02330AK · Installation of the Max-Viz® Enhanced Vision System (EVS) Models 1000/1500 and associated hardware
- Holder
- PECO Inc
- Status date
SR00925DE · Installation of Garmin GTX 335/335R and GTX345/345R transponders to provide ADS-B Out and In functionality
- Holder
- Peregrine
- Status date
SR00188DE · Installation of emergency medical interior configuration using a Lifeport PLUS unit.
- Holder
- LifePort LLC
- Status date
SR00360DE · Installation of medical system.
- Holder
- LifePort LLC
- Status date
SR09082RC · Installation of an air medical system
- Holder
- LifePort LLC
- Status date
SH8615SW · Installation of replacement passenger door windows.
- Holder
- The NORDAM Group LLC
- Status date
SH8613SW · Installation of replacement roof skylight windows.
- Holder
- The NORDAM Group LLC
- Status date
SH8614SW · Installation of replacement of opera picture windows.
- Holder
- The NORDAM Group LLC
- Status date
SH8616SW · Installation of replacement chin bubble windows.
- Holder
- The NORDAM Group LLC
- Status date
SH8632SW · Installation of replacement crew door windows.
- Holder
- The NORDAM Group LLC
- Status date
SH8003SW · Installation of a bleed air heater for the Bell Model 222
- Holder
- RSG Products
- Status date
SH8004SW · Installation of a shock mounted dual pivot litter and fixed attendant seat
- Holder
- RSG Products
- Status date
SH8005SW · Installation of an electrically driven freon air conditioning system
- Holder
- RSG Products
- Status date
SH8673SW · Tail skid modification.
- Holder
- RSG Products
- Status date
SH3613SW · Installation of a pivoting, tracking litter assembly.
- Holder
- RSG Products
- Status date
SH3621SW · Installation of a defibrillator container.
- Holder
- RSG Products
- Status date
SH3623SW · Installation of a medical stowage cabinet in aft cabin bulkhead.
- Holder
- RSG Products
- Status date
SH3624SW · Installation of a litter/ stretcher attachment bracket.
- Holder
- RSG Products
- Status date
SH3625SW · Installation of oxygen bottle rack in baggage compartment.
- Holder
- RSG Products
- Status date
SH7937SW · Installation of an observer/attendant seat.
- Holder
- RSG Products
- Status date
SH7938SW · Installation of a stowable attendant seat.
- Holder
- RSG Products
- Status date
SH7939SW · Installation of a secondary stretcher.
- Holder
- RSG Products
- Status date
SH7940SW · Installation of a primary litter carriage and stowage cabinet.
- Holder
- Fort Worth
- Status date
SH7941SW · Installation of a secondary attendant seat.
- Holder
- RSG Products
- Status date
SH8036SW · Installation of floor tracks for litter/equipment attachments.
- Holder
- RSG Products
- Status date
SH8037SW · Installation of a tracking attendant seat.
- Holder
- RSG Products
- Status date
SH8038SW · Installation of a dual pivot litter with cabinet.
- Holder
- RSG Products
- Status date
SR04212AT · Replace original equipment Nickel-Cadmium (NiCd) main battery with Concorde Lead-Acid, main battery
- Holder
- Concorde Battery Corporation
- Status date
SH5225NM · Installation of a freon air conditioning system.
- Holder
- Air Comm Corporation
- Status date
SH5226NM · Installation of a bleed air cabin heating system.
- Holder
- Air Comm Corporation
- Status date
SH3784SW · Installation of an emergency exit and camera opening window.
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR00457AT · Installation of interior trim parts.
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR01133AT · Manufacture of baggage floor protectors
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR01668AT · Manufacture of Crew Emergency Push Out Windows in accordance with Aeronautical Accessories, Inc. Drawing List Report AA-98035, no revision, dated March 23, 1998, and installation per Report AA-98032, no revision, dated February 26, 1998, or AA-98077, Revision A , dated August 12, 1998, or later FAA approved revisions.
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR01545SE · Installation of a Supplemental Lighting System.
- Holder
- Aviation Specialties Unlimited Inc.
- Status date
SH8591SW · Installation of a Bendix King KLN 90 GPS navigation system.
- Holder
- Texas Aviation Services
- Status date
SR09037RC · Installation of crew window.
- Holder
- Texas Aviation Services
- Status date
SR09140RC · Installation of a Retractable Passenger Step.
- Holder
- Texas Aviation Services
- Status date
SA2693NM · Installation of Electronics International digital volt/amp gauges and accessories.
- Holder
- Electronics International Inc.
- Status date
SR00373NY · Installation of medical equipment bar.
- Holder
- Vancouver Island Helicopters
- Status date
SR01873SE · ONE ONLY STC, SN 47566: Installation of a Supplemental Lighting System.
- Holder
- Aviation Specialties Unlimited Inc.
- Status date
SH2697SO · Installation of a Wire Strike Protection System Kit.
- Holder
- Bristol Aerospace Ltd
- Status date
SR00170BO · Installation of Pratt & Whitney Engine Services, Inc. SmartCycle+ monitoring and recording system.
- Holder
- Pratt & Whitney Engine Services Inc.
- Status date
SH7853SW · Installation of two Allison Model250-C30G engines.
- Holder
- World Wide Helicopters Inc.
- Status date
SR02342NY · Installation of any or all EMS Support Service Kits.
- Holder
- Vancouver Island Helicopters
- Status date
SA00680SE · Installation of Electronics International model UBG-16 or UBG-16T bar graph engine analyzer.
- Holder
- Electronics International
- Status date
SR00811NY · Installation of Technisonic Industries Limited TFM-138 series transceiver models.
- Holder
- Technisonic Industries Limited
- Status date
SR01867NY · Installation of V1H easy load medical interior kits.
- Holder
- Vancouver Island Helicopters
- Status date
SH424NE · Installation of two reinforcing plates P/N TSA-101-1 on Bell P/N 222-062-216-101 exhaust ejector assembly. Eligible for installation on serial numbers up to and including S/N 47146.
- Holder
- Helicopter Support Inc Services Div
- Status date
SH569NE · Installation of an engine inlet screen assembly, Tri-State Aviation P/N TSA001M.
- Holder
- Helicopter Support Inc Services Div
- Status date
SR01834NY · Installation of Globalstar Satellite Telephone System.
- Holder
- Atlantic Avionics Inc.
- Status date
SH8592SW · Installation of a Bendix King RDS 82VP color radar.
- Holder
- Heritage Aviation Ltd
- Status date
SH3817NM · Cockput sun visor installation.
- Holder
- Rosen Sunvisor Systems LLC
- Status date
SR01397LA · Installation of Honeywell (Lycoming) LTS 101-750C-1 engines to replace Honeywell (Lycoming) LTS 101-650C-2, -3, -3A engines in accordance with CALSTAR Master Drawing List No. CAL 101, Revision A, dated September 10, 2002, or later FAA approved revisions. FAA Approved Rotorcraft Flight Manual Supplement No. CAL 104, Revision N/C, dated October 25, 2002, or later FAA approved revision is required with this installation. (See Page 3)
- Holder
- California Shock/Truma Air Rescue (CALSTAR)
- Status date
SR09205RC · Installation of an emergency medical services (EMS) interior. Also authorizes installation of EMS interior in Bell model 222U helicopters, serial numbers 47539, 47547, 47552, and 47564.
- Holder
- Air Methods Corporation
- Status date
SR00235DE · Installation of articulating patient loading system.
- Holder
- Air Methods Corporation
- Status date
SH5700SW · Installation of rear cabin camera window assembly.
- Holder
- NORDAM - Texas
- Status date
SH4593SW · Installation of tail rotor floodlight system.
- Holder
- DeVore Aviation Corporation of America, a New Mexico Corporation
- Status date
SR09084RC · Installation of a Benz engine oil pressure transducer, P/N BAS-222-250G.
- Holder
- Benz Airborne Systems
- Status date
SR09085RC · Installation of a Benz engine torque pressure transducer, P/N BAS-222-80G.
- Holder
- Benz Airborne Systems
- Status date
SR09086RC · Installation of a Benz transmission oil pressure transducer, P/N BAS-222-100G.
- Holder
- Benz Airborne Systems
- Status date
SR09087RC · Installation of a Benz hydraulic oil pressure transducer, P/N BAS-222-2000A.
- Holder
- Benz Airborne Systems
- Status date
SR09004RC · Installation of fixed landing lights to the rear skid cross tubes.
- Holder
- Omniflight Helicopters Inc
- Status date
SH409NE · Installation of 'Zapper,' pulsed chip detection system Model No. 1K1030.
- Holder
- TEDECO Division
- Status date
SR00210NY · Installation of a floor drain kit P/N V22-531003-401.
- Holder
- Vancouver Island Helicopters
- Status date
SH8407SW · Removal of wheeled landing gear and installation of tubular skid gear.
- Holder
- Comtran International, Inc
- Status date
SH8704SW · Installation of fuselage floodlights.
- Holder
- DeVore Aviation Corporation of America, a New Mexico Corporation
- Status date
SH5995SW · Installation of Synergetics retractable passenger door step.
- Holder
- Synergetics, Inc
- Status date
SR00045DE · Installation of Optical Radiation Corp Locator Searchlight, Model B;
- Holder
- Air Methods Corporation
- Status date
SH5903SW · Installation of forward facing recognition lights under fuselage.
- Holder
- DeVore Aviation Corporation of America, a New Mexico Corporation
- Status date
SH8651SW · Approval to operate with crew doors removed.
- Holder
- Bell Helicopter Textron
- Status date
SH8647SW · Installation of an airborne vibration monitoring system.
- Holder
- Rotor Dynamics Americas
- Status date
SR00037DE · Installation of aft emergency push-out windows.
- Holder
- Air Methods Corporation
- Status date
SA1626NM · Installation of Electronics Int'l Digital EGT/CHT Instruments and accessories. (201 Series)
- Holder
- Electronics International
- Status date
SH5255NM · Installation of a right side maintenance step.
- Holder
- Air Methods Corporation
- Status date
SH2252NM · Installation of Silver Instruments Fueltron IIIPT-IGS, IIIPT-IPS, IIIPT-ILS, IIIPT-IKS digital fuel flow indicating system.
- Holder
- Arnav Systems Inc
- Status date
SH1879SO · Install lubrication oil scavenge filter.
- Holder
- Facet Filter Products
- Status date
SA4302NM · Installation of Electronics Int'l digital automatic engine analyzer.
- Holder
- Electronics International
- Status date
SH3727NM · Installation of ARNAV Systems FC-10/FT-10 digital fuel flow indicating system.
- Holder
- Arnav Systems
- Status date
SH313NE · Installation of zapper electric chip detector sys. Model No. 1K690.
- Holder
- TEDECO Division
- Status date
SA324NE · Installation of two reinforcing plates P/N TSA-101-1 on Bell P/N 222-062-216-101 exhaust ejector.
- Holder
- Tri-State Aviation
- Status date
SH2729NM · Installation of tundra pads (bear paws).
- Holder
- Air Methods Corporation International
- Status date
SH132NE · Removal of height-velocity limita- tions and diagram from Limitations Section of RFM and placing in in Performance Section of RFM.
- Holder
- Pittston Co Coal Group
- Status date
Sources
Source: FAA Dynamic Regulatory System, as of Nov 23, 2026.