Free report · Generated Nov 28, 2026 · tailcheck.me/intel/N2GS/stcs
STCs · BELL HELICOPTER TEXTRON CANADA 429
N2GS · 2013 BELL HELICOPTER TEXTRON CANADA 429 · Serial 57152
The same list for every BELL HELICOPTER TEXTRON CANADA 429. Matched on maker and model.
An STC listed here can be installed on this model; whether one is installed on this aircraft is recorded in its logbooks and Form 337s.
60 STCs
ST00885LA · Installation of fire extinguisher cartridges as replacements for Pacific Scientific fire extinguisher cartridges in fire extinguisher bottles.
- Holder
- AMETEK AMERON, LLC d/b/a MASS Systems
- Status date
SR03168CH · Installation of Heli-Preheat System, P/N TA2584-1 for 115 volt application
- Holder
- Hartzell Propeller LLC
- Status date
SR12063AK · Installation of JJASPP Engineering Services Six Place Seating
- Holder
- JJASPP Engineering Services – Alaska LLC
- Status date
SR04262AT · Installation of Aerolite Emergency Medical System (EMS) interior P/N 429-0036800-501
- Holder
- Aerolite America LLC
- Status date
SR04711NY · Replacement of Luminator LS400 LED searchlight (steerable landing light)
- Holder
- Sterling Helicopter
- Status date
SR00532SE · Installation of Certified Technology quick release door pins.
- Holder
- Certified Technology
- Status date
SR02806SE · Installation of dual hook cargo system for carrying Human External Cargo (HEC) and Non-human External Cargo (NHEC) loads,
- Holder
- Onboard Systems International LLC
- Status date
SR00782DE · Approval of a seating configuration to allow flight operations with the left hand pilot seat removed
- Holder
- Bell Textron Inc.
- Status date
SR00791DE · Installation of the skid-gear mounted step to assist in external hoist operations
- Holder
- Bell Textron Inc.
- Status date
SR00829DE · Installation of Baggage Pallet
- Holder
- Bell Textron Inc.
- Status date
SR04705NY · Installation of Astronics (Max-Viz) Model 1400 Enhanced Vision System (EVS)
- Holder
- Avio Design Group Inc
- Status date
SR04213AT · Installation of a barrier net
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR04643NY · Installation of the Floor Protection Kit
- Holder
- Alpine Aerotech LP
- Status date
SR01079DE · Installation of the Green Power Monitoring Systems (GPMS) Foresight MX Condition Monitoring System
- Holder
- Green Power Monitoring Systems
- Status date
SR01068DE · Installation of External Equipment Mounting Provisions
- Holder
- Fulcrum Concepts LLC
- Status date
SR02704SE · Installation and maintenance of the Sunspot 36 and 46 series lights
- Holder
- AeroLED's Holdings LLC
- Status date
SR11247DS · Installation of Connected Aircraft Interface Residing On-board (CAIRO) System
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR04489CH · EMS conversion in accordance with Spectrum Aeromed Master Drawing List 7015DL, Revision: - (Initial), dated June 17, 2020, or later FAA approved revisions.
- Holder
- Spectrum Aeromed LLC dba Spectrum Aeromed
- Status date
SR00708DE-D · Installation of Enhanced Cockpit Avionics Systems.
- Holder
- Air Methods Corporation
- Status date
SR03317NY · Fixed Cabin Step Installation
- Holder
- Dart Aerospace Limited
- Status date
SR03470NY · Installation of EMS Equipment P/N 429-0029300-501 in the Cabin
- Holder
- Aerolite AG
- Status date
SR02124SE · Installation functionality. of Data Garmin Required: transponders: (1) Garmin GTX Master 345/345R Drawing with List ADS-B (MDL), Out and In 005-00734-A4, functionality;
- Holder
- Garmin International Inc
- Status date
SR00359BO · Installation of Parmetheus Plus LED PAR36 and PAR46 taxi and landing lights.
- Holder
- Whelen Aerospace Technologies
- Status date
SR04321NY · Installation of Deep Snow Kit
- Holder
- Alpine Aerotech LP
- Status date
SR04174NY · Installation of the Wearplate Kits
- Holder
- Dart Aerospace Limited
- Status date
SR02600SE · Installation of a Supplemental Lighting System manufactured and installed
- Holder
- Aviation Specialties Unlimited Inc.
- Status date
SR00704DE-D · Installation of Emergency Medical Services Interior and Systems
- Holder
- Air Methods Corporation
- Status date
SR00812DE · Installation of Honeywell Sky Connect Tracker III system
- Holder
- Cert Works LLC
- Status date
SR04029NY · Installation of Aspire 200 IG SATCOM with Cabin Wi-fi System
- Holder
- EMS Technologies Canada Ltd
- Status date
SR02487AK · Installation of L-3 Communications Avionics Systems ESI-500 Standby Instrument System
- Holder
- ADS-B Technologies, LLC
- Status date
SR02943NY · Installation of EMS Equipment P/N 429020-501 & 429020-502 must be in accordance with Aerolite Max Bucher GMBH Master Document List MDL-10-006, Rev. B dated April 29, 2011. This modification is required to be maintained in accordance with Aerolite Operations Manuals OPM-429020-501, Rev. A, dated March 1, 2011 & OPM-429020-502, dated January 19, 2011, respectively. EASA approved Rotorcraft Flight Manual Supplement FMS-429020-501, Rev. A & FMS429020-502, Rev. 0, respectively, are required with these installation.
- Holder
- Aerolite AG
- Status date
SR03696NY · Installation of VIP Cabin Interiors, P/N 6B420000X001-001, consisting of seats layout, entertainment system and life vest provision for P/N 6B422522A004-(XXX)
- Holder
- Mecaer Aviation Group S.p.A.
- Status date
SR04091CH · Installation of an air ambulance conversion kit
- Holder
- Med-Pac Inc.
- Status date
SR03997AT · Installation of Locking Fuel Cap
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR04210AT · Installation of a locking hinge on the baggage door
- Holder
- Turbine Kinetics
- Status date
SR02377LA · Airfilm Nose Utility Mount
- Holder
- Airfilm Camera Systems
- Status date
SR02376LA · Installation of Airfilm Tail Utility Mount
- Holder
- Airfilm Camera Systems
- Status date
SR04187AT · Installation of L-3 Communications Micro Quick Access Recorder (QAR) that records the Flight Data Recorder echo line on flash memory; QAR data can be downloaded via the USB port, or the QAR unit can be removed for flight data analysis
- Holder
- Skybooks, Inc.
- Status date
SR00692DE · Installation of a Cabin Heater System Provisions
- Holder
- Air Comm Corporation
- Status date
SR00693DE · Installation of a Cabin Air Conditioning System Provisions
- Holder
- Air Comm Corporation
- Status date
SR03489NY · Installation of Bear Paw Kit
- Holder
- Alpine Aerotech LP
- Status date
SR00780DE · Installation of Tail Rotor Pedal Removal Kit
- Holder
- Laz-Tec, LLC
- Status date
SR09566RC · Installation of Night Vision Goggle Compatible Lighting System
- Holder
- Aero Dynamix Inc.
- Status date
SR02452LA · Installation of Airfilm Nose Utility Mount Light Kit
- Holder
- Airfilm Camera Systems
- Status date
SR00716DE · Installation of Crew Door Assist Handle in accordance with Aeronautical Accessories Drawing List, Report No AA-10134, Revision A, dated February 09, 2011, FAA approved February 16, 2011, or later FAA approved revision.
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR00739DE · Installation of Sliding Door Push-out Windows in accordance with Laz-Tec Drawing List, Report No. AA-11062, Revision B, dated November 23, 2011, FAA approved December 19, 2011, or later FAA approved revision.
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR00740DE · Installation of Aft Cabin Floor Protectors in accordance with Laz-Tec Drawing List, Report No. AA-11059, Revision B, dated December 07, 2011, FAA approved December 16, 2011, or later FAA approved revision.
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR00741DE · Installation of Removable Crew Doors
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR00743DE · Installation of structural provisions for a blade fold kit
- Holder
- Paravion Technology Inc
- Status date
SR02810NY · The Installation of Hardpoint and Spotter Fixtures
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR02808NY · Installation of Wedge Windows with Sliders into L/H and R/H passenger doors
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR02932NY · Installation of the Ultrapaws in accordance with Dart Aerospace Ltd. Installation Instructions IIN-D429-793 Revision B, dated October 25, 2010, TCCA approved October 27, 2010, or later TCCA approved revision.
- Holder
- Dart Aerospace Limited
- Status date
SR09534RC-D · Installation of a Cargo Mirror in accordance with the Master Drawing List AA-09031 Revision D dated February 11, 2010 or later FAA approved revision. It includes Rotorcraft Flight Manual Supplement (Report No. AA-09030) containing Airspeed limitations for flight with mirror extended and stowed position. Instructions for Continued Airworthiness, AAI Report No. AA-09029 Revision A, dated February 3, 2010, or later FAA accepted revision is required.
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR09536RC-D · Installation of a Health and Usage Monitoring System (HUMS) in accordance with the Master Drawing List (AA-09033 Revision D, dated October 26, 2010 or later FAA approved revision). Rotorcraft Flight Manual Supplement (Report No. AA-09040 Revision 0, dated November 9, 2010, or later FAA approved revision) is required. Instructions for Continued Airworthiness (Report No. AA-09041 Revision B, dated November 9, 2010, or later FAA accepted revision) is required.
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR00707DE · Installation of automatic door openers for crew and passengers doors and installation of pilot and co-pilot floor protectors
- Holder
- Bell Helicopter Textron Inc.
- Status date
SR02791NY · Installation of Wire Strike Protection System
- Holder
- Bristol Aerospace Ltd
- Status date
SR00701DE-D · Installation of a Controllable Searchlight.
- Holder
- Air Methods Corporation
- Status date
SR00698DE-D · Installation of a Patient Loading System.
- Holder
- Air Methods Corporation
- Status date
SR00702DE-D · Installation of Supplemental Strobe Lights.
- Holder
- Air Methods Corporation
- Status date
SR00710DE-D · Installation of Scene Light and Patient Loading Lights.
- Holder
- Air Methods Corporation
- Status date
Sources
Source: FAA Dynamic Regulatory System, as of Nov 23, 2026.