Free report · Generated Nov 28, 2026 · tailcheck.me/intel/N332MD/stcs

STCs · ROBINSON HELICOPTER R22 BETA

N332MD · 1999 ROBINSON HELICOPTER R22 BETA · Serial 2991

The same list for every ROBINSON HELICOPTER R22 BETA. Matched on maker and model.

An STC listed here can be installed on this model; whether one is installed on this aircraft is recorded in its logbooks and Form 337s.

64 STCs

  1. SR12177IB · Installation of Floor Protector

    Holder
    Delastek Inc.
    Status date
  2. SH5244NM · Installation of external pod and camera mount.

    Holder
    Dart Aerospace USA Inc.
    Status date
  3. SR01980WI · Installation of Garmin GI 275 Multi-Function Instrument

    Holder
    Garmin International Inc.
    Status date
  4. SH760NE · Operation of rotorcraft on unleaded and leaded automotive gasoline, 91 minimum anti-knock index(RON + MON)/2. Intermixing with aviation gasoline is also approved.

    Holder
    Petersen Aviation Inc.
    Status date
  5. SA11137SC · Installation of Plane-Power ALT-FLX alternator

    Holder
    Hartzell Engine Technologies, LLC
    Status date
  6. SR03512AT · Installation of HID Landing and Taxi Lights

    Holder
    Whelen Aerospace Technologies
    Status date
  7. SR00557SE · Fabrication of Onboard Systems Model 200-225-00 (without load weight) or 200-226-00 (with load weight) cargo hook suspension system

    Holder
    Onboard Systems International
    Status date
  8. SR00920SE · Fabrication of Onboard Systems Model 200-262-00 cargo hook suspension system

    Holder
    Onboard Systems International
    Status date
  9. SR00102AT · Installation of Skysign Model H-47C electronic billboard.

    Holder
    Sky Sign Inc
    Status date
  10. SR02704SE · Installation and maintenance of the Sunspot 36 and 46 series lights

    Holder
    AeroLED's Holdings LLC
    Status date
  11. SR02124SE · Installation functionality. of Data Garmin Required: transponders: (1) Garmin GTX Master 345/345R Drawing with List ADS-B (MDL), Out and In 005-00734-A4, functionality;

    Holder
    Garmin International Inc
    Status date
  12. SR00359BO · Installation of Parmetheus Plus LED PAR36 and PAR46 taxi and landing lights.

    Holder
    Whelen Aerospace Technologies
    Status date
  13. SR00821DE · Installation of Automatic Dependent Surveillance - Broadcast (ADS-B) Out and in functionality using the BendixKing KT74 Transponder and qualified position sensor and ADS-B In Receiver

    Holder
    Peregrine
    Status date
  14. SR00387BO · Installation of Avidyne 700-00182-XXX IFD5XX and 700-00179-XXX IFD4XX Series Integrated Flight Displays (IFD)

    Holder
    Avidyne Corporation
    Status date
  15. SR02506SE · Installation of the Collective Pull Down System, installed and maintained

    Holder
    HeliTrak Inc
    Status date
  16. SA2586NM · Installation of J.P. Instruments temperature monitoring systems.

    Holder
    J P Instruments
    Status date
  17. SR02487AK · Installation of L-3 Communications Avionics Systems ESI-500 Standby Instrument System

    Holder
    ADS-B Technologies, LLC
    Status date
  18. SR00840DE · Installation of the Rosen Sunvisor System into the Robinson R22. R44 and R66

    Holder
    Rosen Sunvisor Systems LLC
    Status date
  19. SR00197SE · Addition of strug leg fairings to landing gear.

    Holder
    Cascade STC LLC
    Status date
  20. SR02394AK · Replacement of existing landing and/or hover light bulbs with Light Emitting Diode (LED) lighting system

    Holder
    Seaplanes North LLC
    Status date
  21. SA00432SE · Installation of EGT 701 series fuel flow instrument.

    Holder
    J P Instruments
    Status date
  22. SA00861SE · Installation of J.P. Instruments (JPI) fuel flow indicating system

    Holder
    J P Instruments
    Status date
  23. SA01026SE · Improved fuel gascolator assembly.

    Holder
    Steve's Aircraft
    Status date
  24. SR02232LA · Installation of Garmin Model 400W / 500W Series GPS-WAAS Navigation System

    Holder
    Garmin AT Inc.
    Status date
  25. SR03863AT · Installation of Power Flow Systems, Inc. (PFS) tuned exhaust system.

    Holder
    Power Flow Systems Inc
    Status date
  26. SA2693NM · Installation of Electronics International digital volt/amp gauges and accessories.

    Holder
    Electronics International Inc.
    Status date
  27. SR00038BO · Installation of Helipod cargo containers.

    Holder
    Simplex Manufacturing Company
    Status date
  28. SA4172NM · Installation of Aviation Development oil filter.

    Holder
    Aviation Development Corporation
    Status date
  29. SA593CH · Install Champion SlickSTART magneto booster system.

    Holder
    Champion Aerospace LLC
    Status date
  30. SA02033AT · Modification to install an air-oil separator to prevent oil from being aspirated from the engine breather line (47J series w stc's SH4-235SW, SH4-826SW or SH479SW)

    Holder
    M-20 Oil Separators LLC
    Status date
  31. SR01821SE · Installation of High Intensity Discharge (HID) aviation lighting system manufactured

    Holder
    Precise Flight Inc
    Status date
  32. ST00049BO · Installation of a Pratt & Whitney Engine Services, Inc. Health Usage Monitoring System (HUMS) Model 1022, P/N HUMS-A-030-1.

    Holder
    Pratt & Whitney Engine Services Inc.
    Status date
  33. SA00402SE · Installation of a remote spin-on oil filter adapter. (GC-1B w/Lycoming or Cont 360 engine installed)

    Holder
    Aviation Development Corporation
    Status date
  34. SR02089NY · Structural installation of replacement window kits.

    Holder
    Dart Aerospace Limited
    Status date
  35. SA00680SE · Installation of Electronics International model UBG-16 or UBG-16T bar graph engine analyzer.

    Holder
    Electronics International
    Status date
  36. SR01430LA · Installation of Stainless Steel Skid shoes.

    Holder
    Papas Gary Los Angeles Laboratories Inc.
    Status date
  37. SR02037NY · Installation of D022-720-011 cabin floor protectors kit.

    Holder
    Dart Aerospace Limited
    Status date
  38. SH2011CE · Operation of rotorcraft on unleaded automotive gasoline, 87 minimum antiknock index and leaded automotive gasoline, 88 minimum antiknock index (RON + MON)/2. Intermixing with aviation gasoline also approved.

    Holder
    Fuller Howard J Jr
    Status date
  39. SH462NE · Installation of Avco Lycoming O-320-A2C or O-320-C2C engine

    Holder
    Fuller Howard J Jr
    Status date
  40. SR18BO · Installation of a low rotor RPM voice warning system.

    Holder
    Fuller Howard J Jr
    Status date
  41. SR01915NY · Installation of a cargo mirror.

    Holder
    Dart Aerospace Limited
    Status date
  42. SR01362SE · Installation of the support assembly for the ground handling wheel on the skid tube of the above model rotorcraft

    Holder
    Micro AeroDynamics Inc
    Status date
  43. SH3298NM · Installation of Classic Aircraft Products CH-400 Cargo Hook System.

    Holder
    Test Instrumentation Inc
    Status date
  44. SH288NE · Installation of Model 2201 bubble doors.

    Holder
    Fuller Howard J Jr
    Status date
  45. SA02520AT · Installation of M-20 Oil Separator, model 600-WP.

    Holder
    M-20 Oil Separators LLC
    Status date
  46. SR01493NY · Installation of Bearpaws per Dart Installation Instructions IIN-DO22-661, Rev B, dtd 1/3/02 or later Transport Canada approved revision.

    Holder
    Dart Aerospace Limited
    Status date
  47. SA2687NM · Installation of Truboplus/ Electronics Int'l gauges and switches.

    Holder
    Aero Manufacturing Inc.
    Status date
  48. SR00310AT · Installation of antenna platform mounted forward of and attached to skid gear.

    Holder
    Heliflight, Inc
    Status date
  49. SR01059CH · Install Lee Precision, Inc. 'Magic Wand' Cyclic Control System Vibration Absorber.

    Holder
    Lee Precision, Inc
    Status date
  50. SR09189RC · Installation of a modified door and window.

    Holder
    Tech-Tool Plastics Inc
    Status date
  51. SA00678SE · Installation of J. P. Instruments 8Jimline EGT-100 series primary instruments

    Holder
    J P Instruments
    Status date
  52. SH4969NM · Installation and fabrication of the Apollo Model DTM-3 spray tank system.

    Holder
    Airwolf Filter Corporation
    Status date
  53. SA00061LA · Installation of JPI digital tachometer.

    Holder
    J P Instruments
    Status date
  54. SA00238SE · Installation of Aviation Development Corporation's sump mounted chip detector

    Holder
    Aviation Development Corporation
    Status date
  55. SR00166SE · Fabrication and installation of Busse Model CBD-1 Utility Tray Assembly.

    Holder
    Carter Busse Designs
    Status date
  56. SR0003BO · Installation of Helipod cargo containers.

    Holder
    Altair Avionics Corporation
    Status date
  57. SR15BO · Installation of the Altair CCP-A-017-1 Collective Grip Assembly.

    Holder
    Altair Avionics Corporation
    Status date
  58. SR9BO · Installation of the Altair SCY4-A-016-HH, -SH, -NH, or -NS Cyclic Grip Assemblies.

    Holder
    Altair Avionics Corporation
    Status date
  59. SA1626NM · Installation of Electronics Int'l Digital EGT/CHT Instruments and accessories. (201 Series)

    Holder
    Electronics International
    Status date
  60. SH5237NM · Installation of Pneumatic door actuators on left and right cabin doors.

    Holder
    Paravion Technology Inc
    Status date
  61. SA2350NM · Installation of Electronics International Inc digital carburetor/outside air temperature gauges

    Holder
    Electronics International
    Status date
  62. SA4302NM · Installation of Electronics Int'l digital automatic engine analyzer.

    Holder
    Electronics International
    Status date
  63. SA3862NM · Installation of Electronics International Primary TIT/EGT/CHT instruments, remote switches and associated accessories.

    Holder
    Electronics International
    Status date
  64. SA2190NM · Installation of electronics International Digital Volt/Amp Gauges and Accessories.

    Holder
    Electronics International
    Status date

Sources

Search STCs in FAA DRS

Source: FAA Dynamic Regulatory System, as of Nov 23, 2026.