Free report · Generated Nov 29, 2026 · tailcheck.me/intel/N6565L/stcs
STCs · CAMERON BALLOONS US A-105
N6565L · 2012 CAMERON BALLOONS US A-105 · Serial 6646
The same list for every CAMERON BALLOONS US A-105. Matched on maker and model.
An STC listed here can be installed on this model; whether one is installed on this aircraft is recorded in its logbooks and Form 337s.
13 STCs
SB10564SC · Installation of Night Position Lights
- Holder
- Highland Balloon Repair, CRS NHMD682X
- Status date
SB09657RC · Installation of Aircraft Position Lights
- Holder
- Albuquerque Balloon Center, Inc.
- Status date
SB04407AT · Installation of the DBI-III Omega
- Holder
- Balloonacy, Ltd. LLC
- Status date
SB02678CH · ONE ONLY STC, S/N 6538: Replace the Cameron Balloons US Fuel Tanks with the UltraMagic type M-30 and M-40 fuel tanks.
- Holder
- Cameron Balloons US
- Status date
SB01567CH · Replace the Cameron Ballons US Basket with the Thunder & Colt Model 40x60 Basket. the thunder & Colt Basket is installed via the standard Cameron carabiner (snaplink) attachments. (A-105 S/N 5823)
- Holder
- Cameron Balloons US
- Status date
SB00978NY · Installation of Aerostat Envelopes Model W-100-5 Replacement Envelope (4 Point Attachment System).
- Holder
- Ronald T. DiGiovanni
- Status date
SB869NE · Installation of Aerostat Envelopes Model W-140-5 replacement envelope (4-point attachment system).
- Holder
- Ronald T. DiGiovanni
- Status date
SB00886CH · Replace the Cameron Ballons US basket/burner system with the Balloon Works basket/burner system. (A-105 s/n 6174)
- Holder
- Cameron Balloons US
- Status date
SB00407LA · Installation of foam padded tank covers.
- Holder
- John Terry
- Status date
SB509CH · Replace Cameron Balloons basket/burner system and fuel tanks with Aerostar International basket, burner, and fuel tanks. (A-105 S/N 6011)
- Holder
- Cameron Balloons US
- Status date
SB1384GL · Replace the Cameron Balloons Ltd. basket/burner system with an Aerostar Intn'l (Raven) basket/dual burner system.
- Holder
- Cameron Balloons US
- Status date
SA2982SO · Installation of Mach Zero fuel tank assemblies.
- Holder
- Mach Zero Hot Air Balloon Company
- Status date
SB1399GL · Replace the Cameron Balloons Ltd. basket/burner system with a Balloon Works basket/burner system.
- Holder
- Cameron Balloons US
- Status date
Sources
Source: FAA Dynamic Regulatory System, as of Nov 23, 2026.