Free report · Generated Nov 28, 2026 · tailcheck.me/intel/N660EM/stcs

STCs · THRUSH AIRCRAFT LLC S2R-T660

N660EM · 2021 THRUSH AIRCRAFT LLC S2R-T660 · Serial T660-166

The same list for every THRUSH AIRCRAFT LLC S2R-T660. Matched on maker and model.

An STC listed here can be installed on this model; whether one is installed on this aircraft is recorded in its logbooks and Form 337s.

46 STCs

  1. SA04484CH · Installation of a Reabe Aircraft Improvement Power Gate Control System

    Holder
    Reabe Design LLC
    Status date
  2. SA01800SE · Fabrication and installation of new or replacement of existing instrument panel lights dimmer control.

    Holder
    TCW Technologies, LLC
    Status date
  3. SA01861SE · Fabrication and installation of Landing Light Controller

    Holder
    TCW Technologies, LLC
    Status date
  4. SA04837NY · Installation of AeroLED's Holdings, LLC., position lights, navigation lights, strobe lights and beacon lights

    Holder
    AeroLED's Holdings, LLC
    Status date
  5. SA02019SE-D · Installation of Garmin Model GTN 625/635/650; 725/750 Navigation System

    Holder
    Garmin International Inc.
    Status date
  6. SA03040CH · Installation of a digital payload hopper quantity and spray boom pressure indicating system

    Holder
    Reabe Design LLC
    Status date
  7. SA02738CH · Installation of L-3 Communications Avionics Systems

    Holder
    Acron Aviation Inc.
    Status date
  8. SA04046CH · Installation of L-3 GENESIS (TM) Electronic Standby Instrument System (ESI-500/MAG-500)

    Holder
    Acron Aviation Inc.
    Status date
  9. SA04676CH · Installation of a True Quantity Gauge System

    Holder
    Reabe Design LLC
    Status date
  10. SA02658SE · Installation of Garmin GI 275 Multi-Function Display System

    Holder
    Garmin International Inc.
    Status date
  11. SA01540WI · Installation of hydraulically operated hopper loading door and associated control system (ground use only).

    Holder
    Texas Transland LLC
    Status date
  12. SA02266SE · Installation of a Lever Throttle Quadrant

    Holder
    Kawak Aviation Technologies Inc
    Status date
  13. SA01801SE · Installation of a Kawak Aviation Technologies auxiliary system, and optional ancillary equipment.

    Holder
    Air Repair Inc.
    Status date
  14. SA04776NY · The HIPEC Covering and Finishing System must be performed and maintained

    Holder
    HIPEC Aircraft Coatings Inc.
    Status date
  15. SA02265SE · Installation of a camera housing

    Holder
    Airborne Sensor LLC
    Status date
  16. SA04476NY · Installation of a Pratt & Whitney Engine Services, Inc., Flight Data Acquisition Storage and Transmission System (FAST)

    Holder
    Amtech Aeronautical Limited
    Status date
  17. ST03197CH · To install full swiveling locking tail wheel assembly onto the existing spring steel tail gear

    Holder
    Turbine Conversions Ltd
    Status date
  18. SA5190NM · Installation of Gustin Aviation chip detector light system.

    Holder
    A & L Aircraft Parts Inc
    Status date
  19. SA01714WI · Installation of a Garmin transponders: (a) GTX 330/330D/33/33D with ADS-B Out functionality; (b) GTX 335/335R/345/345R with ADS-B Out and In functionality; or (c) GTX 335R/345R with ADS-B Out functionality in select airplanes installed with G950/G1000 systems.

    Holder
    Garmin International Inc
    Status date
  20. SA00344BO · Installation of Parmetheus Plus LED PAR36 and PAR46 taxi and landing lights.

    Holder
    Whelen Aerospace Technologies
    Status date
  21. SA02135SE · Installation of Electronics International Inc. Glass Panel Engine Monitor (with In-Flight Data)

    Holder
    Electronics International Inc.
    Status date
  22. SA01323CH · Installation of a ground single point fueling system.

    Holder
    Turbine Conversions Ltd
    Status date
  23. SA01402SE · Install modified engine cowl.

    Holder
    Cascade Flying Service LLC
    Status date
  24. SA02205SE · Installation of a replacement airframe fuel pump in accordance with Cascade Flying Service Master Drawing List FW-CFS545-90, Rev. B, dated October 19, 2011, or later FAA approved revision.

    Holder
    Cascade Aircraft conversions LLC
    Status date
  25. SA01845WI · Installation of a Center Windshield

    Holder
    Hershey Flying Services
    Status date
  26. SA02444AK · Approval of the L-3 Communications NGT 9000/9000R ADS-B system installed

    Holder
    ADS-B Technologies LLC
    Status date
  27. SA02276AK · Installation of AMSAFE Aviation Inflatable Restraints

    Holder
    AMSAFE Inc.
    Status date
  28. SA03518AT · Installation of a bonded doubler inside the wing leading edge.

    Holder
    Turbine Conversions Ltd
    Status date
  29. SA02442AK · Approval of the L-3 Communications NGT 2000/2500 ADS-B system

    Holder
    ADS-B Technologies, LLC
    Status date
  30. SA02212AK · Replacement of existing landing and/or taxi light reflector and bulbs with high intensity discharge (HID) lighting systems

    Holder
    Seaplanes North LLC
    Status date
  31. ST03554CH · Installation of Rotary Gatekeeper and provisions equipment

    Holder
    Turbine Conversions Ltd
    Status date
  32. SA02951CH · Installation of modified Wing Spar Splice and Cap per Aeronautix Modification Kit

    Holder
    Gulf Coast Ag Aircraft Sales and Maintenance
    Status date
  33. SA02752AT · Installation of the E-Tec ET-107 System that uses a sequential 24V to 48V Fast Start in order to reduce turbine exhaust gas temperatures (EGT) during engine starts

    Holder
    Air Repair Inc
    Status date
  34. SA02985CH · Installation of a Cool Start System in accordance with Installation Instructions , Revision A, dated April 14, 2011, or later FAA Approved revision.

    Holder
    Turbine Conversions Ltd
    Status date
  35. SA00068SE · Installation of fuel flow/pressure instruments. (W/TSIO-360-MB1)

    Holder
    Electronics International Inc.
    Status date
  36. SA2693NM · Installation of Electronics International digital volt/amp gauges and accessories.

    Holder
    Electronics International Inc.
    Status date
  37. SA02247CH · Installation of Pheromone Distribution Pod System

    Holder
    Turbine Conversions Ltd
    Status date
  38. SA04677CH · Installation of a Powered Hopper Lid and Auger System

    Holder
    Reabe Design LLC
    Status date
  39. SA01639NY · Replacement of 12 refrigerant in air conditioning system with Enviro Refrigerant Hotshot R414B.

    Holder
    Scale Modelbuilders Inc.
    Status date
  40. SA2687NM · Installation of Truboplus/ Electronics Int'l gauges and switches.

    Holder
    Aero Manufacturing Inc.
    Status date
  41. SA1626NM · Installation of Electronics Int'l Digital EGT/CHT Instruments and accessories. (201 Series)

    Holder
    Electronics International
    Status date
  42. SA1463NM · Installation of 46-1/2" wing tip extension on each wing tip and a fiberglass tip fairing.

    Holder
    Smith David C
    Status date
  43. SA2350NM · Installation of Electronics International Inc digital carburetor/outside air temperature gauges

    Holder
    Electronics International
    Status date
  44. SA4302NM · Installation of Electronics Int'l digital automatic engine analyzer.

    Holder
    Electronics International
    Status date
  45. SA3862NM · Installation of Electronics International Primary TIT/EGT/CHT instruments, remote switches and associated accessories.

    Holder
    Electronics International
    Status date
  46. SA2190NM · Installation of electronics International Digital Volt/Amp Gauges and Accessories.

    Holder
    Electronics International
    Status date

Sources

Search STCs in FAA DRS

Source: FAA Dynamic Regulatory System, as of Nov 23, 2026.