Free report · Generated Nov 29, 2026 · tailcheck.me/intel/N814SS/stcs

STCs · VIKING AIR LIMITED DHC-6-400

N814SS · 2014 VIKING AIR LIMITED DHC-6-400 · Serial 901

The same list for every VIKING AIR LIMITED DHC-6-400. Matched on maker and model.

An STC listed here can be installed on this model; whether one is installed on this aircraft is recorded in its logbooks and Form 337s.

74 STCs

  1. SA02386AK · Replacement of existing landing and/or taxi light reflector and bulbs with Light Emitting Diode (LED) lighting systems

    Holder
    AeroLED's Holding LLC
    Status date
  2. SA1841NM · Installation of larger windows and the lowering of the seats.

    Holder
    Twin Otter STC Holdings, LLC
    Status date
  3. SA12430IB · Installation of the Garmin G1000 NXi Integrated Flight Deck System

    Holder
    Aerocorp Avionics Solutions Inc.
    Status date
  4. SA04837NY · Installation of AeroLED's Holdings, LLC., position lights, navigation lights, strobe lights and beacon lights

    Holder
    AeroLED's Holdings, LLC
    Status date
  5. SA943EA · Replacement of de Havilland wing bleed air ducting with alternate ducting.

    Holder
    Texas Air Services Inc.
    Status date
  6. SA03749NY · Installation of Garmin G950 Integrated Flight Deck System

    Holder
    Aerocorp Avionic Solutions Inc.
    Status date
  7. SA12101IB · Installation of Cabin Interior Upgrade

    Holder
    De Havilland Aircraft of Canada Limited
    Status date
  8. SA00887LA · Installation of Pitot Heater Fail Lights.

    Holder
    Team J.A.S
    Status date
  9. SA02556LA · Installation of Passenger Utility Seats

    Holder
    Team J.A.S
    Status date
  10. SA02649LA · Installation of Max-Viz 2300 Enhanced Vision System

    Holder
    Team J.A.S
    Status date
  11. SA02730LA · Installation of High-Flow 250 AMP Starter-Generators

    Holder
    Team J.A.S
    Status date
  12. SA02806LA · Structural Provisions for AFT Camera Hatch

    Holder
    Team J.A.S
    Status date
  13. SA04046CH · Installation of L-3 GENESIS (TM) Electronic Standby Instrument System (ESI-500/MAG-500)

    Holder
    Acron Aviation Inc.
    Status date
  14. SA09887AC · Installation of an Avionica MK-III mini Quick Access Recorder (QAR) and optional 4G or LTE Avionica\nCellular Module (avCM

    Holder
    Aircraft Systems and Manufacturing Inc.
    Status date
  15. SA39CH · Installation of an Amphibian Landing Gear Position Advisory System/Laser Gear Advisory System

    Holder
    Wipaire Inc.
    Status date
  16. SA00345BO · Installation of an NVIS / NVG Compatible Lighting System

    Holder
    ATI Engineering Services LLC
    Status date
  17. SA00196IB · Installation of the Replacement Aluminum Cargo Floor Panels

    Holder
    Rocky Mountain Aircraft
    Status date
  18. SA02658SE · Installation of Garmin GI 275 Multi-Function Display System

    Holder
    Garmin International Inc.
    Status date
  19. SA00157IB · Installation of the Cabin Audio System Upgrade

    Holder
    Unity Aviation Canada Ltd.
    Status date
  20. SA00085IB · Installation of Elevator Replacement Trailing Edge

    Holder
    Rocky Mountain Aircraft
    Status date
  21. SA02010WI · Installation of the Mid-Continent Instruments & Avionics MD23 FLEX Custom Function Display (CFD)

    Holder
    Mid-Continent Instruments and Avionics
    Status date
  22. SA00076IB · Installation of Photo luminescent Safety Systems

    Holder
    STG AEROSPACE GERMANY GmbH
    Status date
  23. SA04482CH · INSTALL TELEDYNE FLIR INC STAR SAFIRE 380-HDc FLIR IMAGING SYSTEM WITH LASER RANGE FINDER (LRF)

    Holder
    MAG AEROSPACE
    Status date
  24. SA04701NY · Replacement of Fixed Wing Control Cables

    Holder
    Thunder Bay Aviation Ltd
    Status date
  25. SA04698NY · Approval of an Controlled Aircraft Equipment Configuration providing for the authorized use of \n Transmitting Portable Electronic Devices (TPED)

    Holder
    Kilroy Aviation LLC
    Status date
  26. SA00282NY · Replacement latches on upper and lower cargo door.

    Holder
    PMA Design & Manufacturing Inc.
    Status date
  27. SA04587NY · Installation of Acorn Welding C6SC1107-NG Exhaust stacks

    Holder
    Acorn Welding Ltd.
    Status date
  28. SA09856AC · Installation of BendixKing Aerowave 100 In-flight Data Link System for non-essential, non-required aircraft Cabin Systems & Equipments

    Holder
    Honeywell International Inc (Bendix King)
    Status date
  29. SA04651NY · Aft Lavatory Installation

    Holder
    Viking Air Limited
    Status date
  30. SA02265SE · Installation of a camera housing

    Holder
    Airborne Sensor LLC
    Status date
  31. SA09894AC · Installation of Night Vision Goggle (NVG) compatible lighting system in Viking Air Limited Model DHC-6-300 modified

    Holder
    Aero Dynamix Inc.
    Status date
  32. SA04623NY · Installation of Type 1 (PAA Design group) DHC-6 Twin Otter Seats

    Holder
    Regent Aircraft Services
    Status date
  33. SA04595NY · Installation of STC-AT-141

    Holder
    AIRBORNE TECHNOLOGIES GmbH
    Status date
  34. SA04575NY · Installation of IKHANA Station 332 Bulkhead Door

    Holder
    IKHANA Aircraft Canada Inc.
    Status date
  35. SA04284NY · Installation of the K-A Band Antenna and system provisions

    Holder
    airplus engineering GmbH
    Status date
  36. SA04565NY · Installation of the Replacement Cabin Roof Escape Hatch

    Holder
    Rocky Mountain Aircraft
    Status date
  37. SA02267LA · Approves the Viking Air Limited DHC-6-300 and DHC-6-400 landplanes to take off and land at a maximum weight of 14,000 pounds and DHC-6-300 and DHC-6-400 floatplanes to take off and land at a maximum weight of 13,600 pounds.

    Holder
    IKHANA Group Inc.
    Status date
  38. SA02627LA · Installation of wing hardpoints

    Holder
    IKHANA Group Inc.
    Status date
  39. SA04486CH · EMS conversion in accordance with Spectrum Aeromed Master Drawing List 6080DL, Revision: 1 (One), dated September 22, 2020,\nor later FAA approved revisions.

    Holder
    Spectrum Aeromed LLC dba Spectrum Aeromed
    Status date
  40. SA04514NY · Single/Dual Transponder System ADS-B Upgrade

    Holder
    Scandinavian Avionics Design ApS
    Status date
  41. SA04444CH · Installation of Forward-Looking Infrared Radar (FLIR) System Provisions in accordance with MAG Aerospace Master Data List, Doc. No. 2020006-MDL-100, Revision F, dated June 23, 2020.

    Holder
    MAG Aerospace
    Status date
  42. SA04437NY · Installation of the VIP Club Seating

    Holder
    IKHANA Aircraft Canada Inc.
    Status date
  43. SA01452CH · Installation of an air ambulance conversion kit.

    Holder
    Med-Pac Inc.
    Status date
  44. SA04458AT · Installation of the PMA Design and Manufacturing nose landing gear (NLG) shock strut assembly

    Holder
    PMA Design & Manufacturing Inc.
    Status date
  45. SA03768NY · Installation of Enhanced Air Conditioning System

    Holder
    IKHANA Aircraft Canada Inc.
    Status date
  46. SA00344BO · Installation of Parmetheus Plus LED PAR36 and PAR46 taxi and landing lights.

    Holder
    Whelen Aerospace Technologies
    Status date
  47. SA03266NY · Installation of a Cockpit (crew) Oxygen System

    Holder
    IKHANA Aircraft Canada Inc.
    Status date
  48. SA00355BO · Installation of a Ballistic Protection System

    Holder
    MAG Aerospace
    Status date
  49. SA00356BO · Installation of a cargo floor.

    Holder
    MAG Aerospace
    Status date
  50. SA00366BO · Installation of a Roll-Up Door System

    Holder
    MAG Aerospace
    Status date
  51. SA00367BO · Installation of a FLIR Systems Inc. Star Safire 380HD EO/IR System

    Holder
    MAG Aerospace
    Status date
  52. SA00372BO · Installation of a Mission Avionics System

    Holder
    MAG Aerospace
    Status date
  53. SA02501AK · Installation of a Lexavia LFS-3505 Enhanced Vision System (EVS)

    Holder
    Lexavia Integrated Systems
    Status date
  54. SA10407SC · Installation of a replacement electrically driven hydraulic pump assembly

    Holder
    Texas Air Services Inc
    Status date
  55. SA03275NY · Installation of Crew Only Supplementary Oxygen System

    Holder
    Rocky Mountain Aircraft
    Status date
  56. SAS03826NY · Installation of Fold Up Utility Seats

    Holder
    Rocky Mountain Aircraft
    Status date
  57. SA00382BO · Installation of Globalstar Antenna and Cradle provisions to support a Globalstar GPS-1700 in non-composite airplanes

    Holder
    Avidyne Corporation
    Status date
  58. SA02444AK · Approval of the L-3 Communications NGT 9000/9000R ADS-B system installed

    Holder
    ADS-B Technologies LLC
    Status date
  59. SA03757NY · Installation of the Replacement Fuel Manifold Tubes

    Holder
    Rocky Mountain Aircraft
    Status date
  60. SA2CH · Installation of Wipaire Model 13000 Amphibian Floats

    Holder
    Wipaire Inc
    Status date
  61. SA4622SW · Installation of JLC Aeronautical Vapor Cycle Air Conditioner

    Holder
    JLC Aeronautical LLC
    Status date
  62. SA09653RC · Installation of fuselage hinged fuel caps

    Holder
    Texas Air Services Inc
    Status date
  63. SA01969SE · Installation of a Mid-Continent MD302 Standby Attitude Module

    Holder
    Mid-Continent Instruments and Avionics
    Status date
  64. SA02442AK · Approval of the L-3 Communications NGT 2000/2500 ADS-B system

    Holder
    ADS-B Technologies, LLC
    Status date
  65. SA03455NY · Installation of a passenger oxygen system

    Holder
    IKHANA Aircraft Canada Inc.
    Status date
  66. SA00269BO · Installation of Avidyne Corporation TWX 670 Tactical Weather Detection System P/N 850-00026-000-( ) consisting of Avidyne Processor P/N 700-00033-000-( ), Sensor Systems Inc. Antenna P/N S72-1715-1 with doubler plate P/N S72-171530-1, and Avidyne Mounting Tray P/N 700-00034-000.

    Holder
    Avidyne Corporation
    Status date
  67. SA03385NY · Installation of Passenger Cabin Utility Hard Points

    Holder
    IKHANA Aircraft Canada Inc.
    Status date
  68. SA03368NY · Installation of 4-Blade MT-Propeller (Model# MTV-16-1-E-C-F-R(P) / CFR240-55)

    Holder
    MT- Propeller Entwicklung GmbH
    Status date
  69. SA03245NY · Installation of R.W. Martin Air conditioning system

    Holder
    IKHANA Group Inc.
    Status date
  70. SA02149AK · Installation of GX50/60 GPS Navigator, Capstone configured MX20 Multi-Function Display and UAT transceiver.

    Holder
    Garmin International Inc
    Status date
  71. SA02808CH · Installation of an executive seating system

    Holder
    Wipaire Inc
    Status date
  72. ST03258NY · Replace BF Goodrich nose wheel, 8.90-12.5 PIN 3-1197, Beringer wheel assembly P/N: RA-008

    Holder
    Beringer Aero
    Status date
  73. SA2366WE · Installation of emblem lights at mid span of horizontal stabilizer.

    Holder
    DeVore Aviation Corporation of America, a New Mexico Corporation
    Status date
  74. SA12348IB · Installation of the TB50 Lithium Battery

    Holder
    Rocky Mountain Aircraft

Sources

Search STCs in FAA DRS

Source: FAA Dynamic Regulatory System, as of Nov 23, 2026.