Free report · Generated Nov 29, 2026 · tailcheck.me/intel/N8977R/stcs
STCs · CHAMPION 7GCB
N8977R · 1960 CHAMPION 7GCB · Serial 7KC-1
The same list for every CHAMPION 7GCB. Matched on maker and model.
An STC listed here can be installed on this model; whether one is installed on this aircraft is recorded in its logbooks and Form 337s.
142 STCs
SA12524AK · Fabrication and installation of Sport Aircraft Seats, LLC seat pan and cushion system
- Holder
- Sport Aircraft Seats, LLC
- Status date
SA00343BO · Installation of a single configuration or a dual configuration Avidyne Corporation Integrated Flight Display, Model IFD540 loaded with Release 10.0 software (or later FAA approved release)
- Holder
- Avidyne Corporation
- Status date
SA00352BO · Installation of an Avidyne Corporation Mode A/C/S Transponder with ADS-B Out capability, Model AXP340 loaded with Version 3.13 software (or later FAA approved version),
- Holder
- Avidyne Corporation
- Status date
SA01233SE · Fabrication and installation of Alaskan Bushwheel LLC tail wheel and fork assembly
- Holder
- ABI, LLC
- Status date
SA02571SE · Installation of Garmin G500/G600 TXi Integrated Avionics System (Primary Flight Display, Multi-Function Display, and Engine Indicating System Display).
- Holder
- Garmin International Inc.
- Status date
SA01861SE · Fabrication and installation of Landing Light Controller
- Holder
- TCW Technologies, LLC
- Status date
SA01800SE · Fabrication and installation of new or replacement of existing instrument panel lights dimmer control.
- Holder
- TCW Technologies, LLC
- Status date
SA04837NY · Installation of AeroLED's Holdings, LLC., position lights, navigation lights, strobe lights and beacon lights
- Holder
- AeroLED's Holdings, LLC
- Status date
SA04652CH · To allow use of 100R grade aviation fuel meeting Swift Fuel, LLC specification
- Holder
- Swift Fuels LLC
- Status date
SA02636SE · Installation of Garmin GPS 175 Navigation System and GNX 375 Navigation System with ADS-B In/Out Transponder.
- Holder
- Garmin International Inc.
- Status date
SA02019SE-D · Installation of Garmin Model GTN 625/635/650; 725/750 Navigation System
- Holder
- Garmin International Inc.
- Status date
SA800EA · Installation of Whelen Anti-Collision, Position, or Anti-Collision/Position Light System, and applicable associated power supplies
- Holder
- Whelen Aerospace Technologies
- Status date
SA33CE · If Champion Part Number 7-480 door is installed, remove two of AN 380-2-2 cotter pins and two of AN 393-3 flat head pins as necessarry to remove one door. If American Champion Part Number 7-1265 door is installed, remove quick release pins to remove one door. Weight change --10lb at +21.06 arm
- Holder
- National Aeronca Association
- Status date
SA00081NY · Installation of Iceman Aviation Supplies, Inc. Carburetor Ice Detector.
- Holder
- Alcor LLC
- Status date
SA04046CH · Installation of L-3 GENESIS (TM) Electronic Standby Instrument System (ESI-500/MAG-500)
- Holder
- Acron Aviation Inc.
- Status date
SA7965SW · Application of fabric and polyurethane finishing system.
- Holder
- Shady Aviation LLC
- Status date
SA01240SE · Installation of secondary voltage indication system
- Holder
- Visual Instruments LLC
- Status date
SA04378CH · Installation of an engine modified per STC SE04349CH
- Holder
- SureFly Partners Ltd.
- Status date
SA03898NY · Installation and maintenance of ORATEX covering and coating material
- Holder
- Aircraft Design & Certification Ltd
- Status date
SA02658SE · Installation of Garmin GI 275 Multi-Function Display System
- Holder
- Garmin International Inc.
- Status date
SA02576AK · Installation of Cleveland and ABI, LLC Wheel and Brake Kits
- Holder
- ABI LLC
- Status date
SA11137SC · Installation of Plane-Power ALT-FLX alternator
- Holder
- Hartzell Engine Technologies, LLC
- Status date
SA3-368 · Installation of Wipaire Skis Model A2000A main wheel replacement ski.
- Holder
- F.Atlee Dodge Aircraft Services
- Status date
SA3-628 · Installation of Wipaire Skis Model3000 main and Model 1000 nose skis.
- Holder
- F.Atlee Dodge Aircraft Services
- Status date
SA02987CH · Installation of the Electroair Electronic Ignition System
- Holder
- Electroair Acquisition Corporation
- Status date
SA04776NY · The HIPEC Covering and Finishing System must be performed and maintained
- Holder
- HIPEC Aircraft Coatings Inc.
- Status date
SA02444AK · Approval of the L-3 Communications NGT 9000/9000R ADS-B system installed
- Holder
- ADS-B Technologies LLC
- Status date
SA01015SE · Installation of eligible Alaska Bushwheel, Inc. wheels and TSO-C62d tires
- Holder
- ABI LLC
- Status date
SA02553AK · Fabrication and installation of a Tail Wheel Anti-Shimmy Dampener
- Holder
- Keller Engineering Group LLC
- Status date
SA4503NM · Remove original cloth covering and install Ceconite covering
- Holder
- Ceconite Division of Poly-Fiber Inc.
- Status date
SA220SO · Tow bar, release mechanism, and safety tow link.
- Holder
- Fliegen Works Inc. \n d/b/a Pacific Aerial Tow Hooks
- Status date
SA00401BO · Installation of a SkyTrax100B UAT receiver
- Holder
- Avidyne Corporation
- Status date
SA00410BO · Installation of an AV-30-C Multi-Mode Indicator
- Holder
- uAvionix Corporation
- Status date
SA02268CH · Installation of Airwolf Filter Corp. Air Oil Separator
- Holder
- Airwolf Filter Corporation
- Status date
SA04301CH · Attachment of fabric covering and wing leading edge
- Holder
- C William Pancake Jr
- Status date
SA2710WE · Installation of carburetor heat box bearings.
- Holder
- Del-Air
- Status date
SA01714WI · Installation of a Garmin transponders: (a) GTX 330/330D/33/33D with ADS-B Out functionality; (b) GTX 335/335R/345/345R with ADS-B Out and In functionality; or (c) GTX 335R/345R with ADS-B Out functionality in select airplanes installed with G950/G1000 systems.
- Holder
- Garmin International Inc
- Status date
SA04032CH · Install rocker switch assemblies
- Holder
- Electroair Acquisition Corporation
- Status date
SA00344BO · Installation of Parmetheus Plus LED PAR36 and PAR46 taxi and landing lights.
- Holder
- Whelen Aerospace Technologies
- Status date
SA615EA · Installation of a Whelen Anti-Collision Strobe Light System as replacement for originally installed anti-collision lights.
- Holder
- Whelen Aerospace Technologies
- Status date
SA04362CH · Installation of the uAvionix skyBeacon Automatic Dependent Surveillance-Broadcast (ADS-B) Out
- Holder
- uAvionix Corporation
- Status date
SA04165NY · Installation of Latitude Technologies Skynode S200 Satcom system must be performed
- Holder
- Latitude Technologies Corporation
- Status date
SA00024NY · Installation of Airwolf remote mounted engine oil filter kit AFC-K007 on single or multi-engine fixed wing light aircraft incorporating Lycoming reciprocating engines of 450 horsepower or less.
- Holder
- Airwolf Filter Corporation
- Status date
SA01933LA-D · Installation of Garmin Model 400W / 500W Series GPS-WAAS Navigation System
- Holder
- Garmin International Inc
- Status date
SA02212AK · Replacement of existing landing and/or taxi light reflector and bulbs with high intensity discharge (HID) lighting systems
- Holder
- Seaplanes North LLC
- Status date
SA3829NM · Installation and Manufacturing of Aluminum Wing Spars
- Holder
- MILMAN Engineering Inc
- Status date
SA00382BO · Installation of Globalstar Antenna and Cradle provisions to support a Globalstar GPS-1700 in non-composite airplanes
- Holder
- Avidyne Corporation
- Status date
SA02428SE · Installation of an Air Stream Switch for an electric time recording device on non-pressurized aircraft
- Holder
- Henry F Rogers/David E Polley
- Status date
SA02476AK · Installation of the Airglas, Inc. LC18-ACA Cargo Pod
- Holder
- Airglas Inc.
- Status date
SA00780SE · Installation of the True Lock Safety Retention Axle Lock Nut System
- Holder
- True Lock LLC
- Status date
SA11172SC · Installation of an ADS600-B Automatic Dependent Surveillance-Broadcast (ADS-B) Universal Access Transceiver (UAT) and Global Positioning System (GPS) antenna
- Holder
- NavWorx Inc
- Status date
SA2309WE · Installation of Madras Air Service Part No. 104 wing tips.
- Holder
- Madras Air Service
- Status date
SA4773NM · Installation of replacement metal leading edge.
- Holder
- MILMAN Engineering Inc
- Status date
SA02119SE · Installation of Garmin GDL 88 ADS-B UAT Transceiver System
- Holder
- Garmin International Inc
- Status date
SA00860SE · Installation of Rainbow Flying Service fuselage formers.
- Holder
- Rainbow Flying Service
- Status date
SA01089SE · Improved replacement floor boards.
- Holder
- Rainbow Flying Service
- Status date
SA00478CH · Installation of Cooper Superflite 102 Fabric.
- Holder
- Aviation Products Systems Inc.
- Status date
SA01229SE · Installation of GNS 480 (CNX80) GPS WAAS Navigator with integrated VHF Navigation and Communication radios
- Holder
- Garmin International Inc
- Status date
SA02442AK · Approval of the L-3 Communications NGT 2000/2500 ADS-B system
- Holder
- ADS-B Technologies, LLC
- Status date
SA4305WE · Installation of GAR-AERO wheel adapters and tundra type tires on the main landing gear
- Holder
- Seaplanes North LLC
- Status date
SA01669CH · Installation of Challenger Reusable Air Filter
- Holder
- Challenger Aviation Products Inc.
- Status date
SA02283SE · Installation of Electronics International Inc. Glass Panel Engine Monitor (with In Flight Data) CGR-30P
- Holder
- Electronics International Inc.
- Status date
SA02402SE · Installation of Electronics International Inc. Glass Panel Engine Monitor (with In-Flight Data) CGR-30C
- Holder
- Electronics International Inc.
- Status date
SA3531NM · Installing copper electrical cables. (182 S/N 33000 THRU 33842) (8E 833 and UP)
- Holder
- Bogert Aviation
- Status date
SA02121SE · Installation of Garmin GTS 825 (TAS) or GTS 855 (TCAS I) Traffic System
- Holder
- Garmin International Inc
- Status date
SA02428AK · Installation of a hydraulically actuated ski drag assembly
- Holder
- Northern Airframes LLC
- Status date
SA02295SE · Installation of an alternate method of fastening aluminum wing ribs to wood spars
- Holder
- Rainbow Flying Service LLC
- Status date
SA01765SE · Installation of Alaskan Bushwheel TSO-C26d wheels, Part Number (P/N) ABI-1010
- Holder
- ABI, LLC
- Status date
SA02717NY · Installation of VoiceFlight Systems LLC VFS101 Speech Recognition Module
- Holder
- VoiceFlight Systems LLC
- Status date
SA02825NY · Installation of Aerospace Logic Aircraft Instruments
- Holder
- Aerospace Logic Inc.
- Status date
SA01692SE · Installation of a Garmin GMX 200 Multi-Function Display
- Holder
- Garmin International Inc
- Status date
SA216AL · Installation of Airglas Engineering Model L2500A skis
- Holder
- Airglas Inc.
- Status date
SA5156NM · Fabrication and installation of Pulsar-MOSFET Landing Light Flasher System
- Holder
- AvTek
- Status date
SA01487SE-D · Installation of a GDL 69 or GDL 69A XM Satellite Receiver
- Holder
- Garmin International Inc
- Status date
SA1970CE · Operation of airplanes on unleaded automotive gasoline
- Holder
- Petersen Aviation Inc
- Status date
SA1315WE · Installation of Mixture Monitor (exhaust gas temperature probe, gage and selector) in accordance with Delta Products Part Lists A-192 and A-193, or in accordance with Tri-Star Corporation Mixture Monitor Installation Instructions dated December 9, 1981, or later FAA approved revision and/or Drawing List MM-127 dated November 15, 1981, or later FAA approved revision in aircraft models listed in Master Eligibility List P-80-A-6 revised March 29, 1968, copy attached, or later FAA approved revision.
- Holder
- Universal Corporation
- Status date
SA02110CH · Installation of a Time Trac Data Recorder
- Holder
- P2 Incorporated
- Status date
SA2693NM · Installation of Electronics International digital volt/amp gauges and accessories.
- Holder
- Electronics International Inc.
- Status date
SA4172NM · Installation of Aviation Development oil filter.
- Holder
- Aviation Development Corporation
- Status date
SA01988SE · Installation of Electronics International Inc. Glass Panel Engine Monitor (with In-Flight Data) MVP-50P.
- Holder
- Electronics International Inc.
- Status date
SA563CH · Authorizes installation of engines equipped w/Unison Limited Authority Spark Advance Regulator (LASAR) ignition system w/Cylinder Head Temp. (CHT) monitoring capability on airframes. engines.
- Holder
- Champion Aerospace LLC
- Status date
SA593CH · Install Champion SlickSTART magneto booster system.
- Holder
- Champion Aerospace LLC
- Status date
SA02033AT · Modification to install an air-oil separator to prevent oil from being aspirated from the engine breather line.
- Holder
- M-20 Oil Separators LLC
- Status date
SA01473SE · Installation of a GTX 32 (mode C), GTX 33 (mode S), or GTX 33D (mode S with diversity) Remote Transponde
- Holder
- Garmin AT Inc.
- Status date
SA4005NM · Precise Flight Inc. Pulselite Control System
- Holder
- Precise Flight Inc
- Status date
SA1512WE · Installation of exhaust gas temperature monitoring systems Model EGT-1.
- Holder
- K S Avionics Inc
- Status date
SA2557NM · Installation of KS Avionics EGT/CHT-2( ) combined exhaust gas and cylinder head temperature monitoring system.
- Holder
- K S Avionics Inc
- Status date
SA01695SE · Installation of an antenna
- Holder
- Garmin AT Inc.
- Status date
SA00402SE · Installation of a remote spin-on oil filter adapter. (GC-1B w/Lycoming or Cont 360 engine installed)
- Holder
- Aviation Development Corporation
- Status date
SA00823SE · Fabrication and Installation of Rainbow Flying Service front and rear wing spars and modified wing ribs
- Holder
- Rainbow Flying Service
- Status date
SA241CH · Install Ceconite 101 fabric.
- Holder
- Aviation Products Systems Inc.
- Status date
SA34CH · Installation of Cleveland Main Wheels 40-28 and brakes 30-19.
- Holder
- Aero Fabricators Co
- Status date
SA507CH · Installation of Cleveland based hydraulic toe brake rudder pedal system.
- Holder
- Aero Fabricators Co
- Status date
SA73CH · Installation of Wing Strut Fittings, P/N SAR 2-893 or SAR 2-893-1, and stiffeners, P/N 2-5009, in accordance with Safe Air Repair Installation Instructions SAR 2-5007, no revisions, dated April 30, 1993, or later FAA approved revisions.
- Holder
- Aero Fabricators Co
- Status date
SA01158WI · Installation of Aero Enhancements UV250-1 Supplemental Instrument Panel Lightning System.
- Holder
- Aero Enhancements Inc.
- Status date
SA2683NM · Installation of Precise Flight, Inc. stand-by vacuum system (SVS)
- Holder
- Precise Flight Inc
- Status date
SA01157LA · Installation of Electronics International Model FP-5 or FP-5L fuel flow/fuel pressure instrument as a replacement instrument.
- Holder
- Electronics International Inc.
- Status date
SA02154AK · Installation of the UPS Aviation Technologies Inc. Apollo MX20 multi-function display, P/N 430-0270-500.
- Holder
- Garmin AT Inc.
- Status date
SA01487SE · Installation of a GDL 69 or GDL 69A XM Satellite Receiver in accordance with Garmin Supplemental Type Certificate Master Data List, P/N 005-C0217-00, Revision A, dated December 20, 2004, or later FAA approved revision.
- Holder
- Garmin AT Inc.
- Status date
SA02217AK · Installation of Garmin AT Model GDL90 UAT Data Link System, in accordance with Garmin AT, Inc., GDL 90 UAT Master Data List, P/N 560-0278-01, Revision A, dated November 12, 2004, or later FAA approved revision.
- Holder
- Garmin AT Inc.
- Status date
SA01944CH · Modify airplane to fly on unleaded automotive gasoline, 87 minimum antiknock index, per ASTM Specification D-439 or D-4818 of any volatility class, A through E, or 82UL AVGAS per ASTM D-6227.
- Holder
- Experimental Aircraft Association Inc.
- Status date
SA847GL · Superseded by STC SA01944CH. Modify airplane to fly on unleaded automotive gasoline, 87 minimum antiknock index, STC SE800GL approved, 87 minimum antiknock index.
- Holder
- EAA Aviation Foundation
- Status date
SA754CE · Install Aero Model M1500, M1800 or M2000 main skis. (7GCAA w/oleo)
- Holder
- Aero Ski Manufacturing Co Inc
- Status date
SA8075SW · Installation of fiberglass covering. (M-62 SERIES PT-19) (G-73 SCHWEIZER)
- Holder
- Razorback Fabrics Inc
- Status date
SA10126SC · Installation of Aero Advantage ADV200 series vacuum pump per Aero Advantage Drawing Number ADVMSI 500 latest FAA approved revision.
- Holder
- Aero Holdings Ltd. a Texas limited partnership
- Status date
SA1008WE · Installation of Poly-Fiber covering material.
- Holder
- Poly-Fiber Inc.
- Status date
SA489EA · Installation of ARP Inc. carburetor ice detection system
- Holder
- Aircraft & Rotorcraft Products (ARP) Inc
- Status date
SA1504GL · Surrendered and incorporated into STC SA241CH.
- Holder
- Cooper Aviation Supply Company, Inc.
- Status date
SA02520AT · Installation of M-20 Oil Separator, model 600-WP.
- Holder
- M-20 Oil Separators LLC
- Status date
SA00795SE · Installation of vortex generators on the wings and tail surfaces of the above model aircraft in accordance with Drawing Package MA2131, Revision A, dated April 22, 2001, and Installation Manual MA2132, Revision A, dated April 22, 2001, or later FAA approved revision of either of these documents. NOTE: If more than five vortex generators are damaged or missing, the aircraft is not airworthy.
- Holder
- Micro AeroDynamics Inc
- Status date
SA09470SC · Installation of Starter Indicator light system.
- Holder
- Texas Skyways Inc
- Status date
SA00279LA · Installation of Ameri-King AK-950 Global Positioning System Navigation Switching/Annunciator Panel and Associated Equipment
- Holder
- Ameri-King Corporation
- Status date
SA00527SE · Installation of Inspection Covers over the wing front spar
- Holder
- Ronald S. Piercy dba Rainbow Flying Service
- Status date
SA2687NM · Installation of Truboplus/ Electronics Int'l gauges and switches.
- Holder
- Aero Manufacturing Inc.
- Status date
SA00091BO · Installation of Lycoming O-360-C2E engine, Sensenich 76EM8S9-0-56 propeller, and Bellanca 8GCBC cowling and engine mount.
- Holder
- Emond Ronald L
- Status date
SA5925NM · Installation of oil pressure/temperature instrument.
- Holder
- Electronics International
- Status date
SA5924NM · Installation of RPM instrument.
- Holder
- Electronics International
- Status date
SA2-934 · Installation of fiberglass covering
- Holder
- Razorback Fabrics Inc
- Status date
SA531CH · Installation of Mitchell oil pressure gauge and oil temperature gauge.
- Holder
- Mitchell Aircraft Products
- Status date
SA4760NM · Replace wing rib PK screws with Marson Klick fast rivets (pop rivets).
- Holder
- Cashmere Aviation Inc
- Status date
SA00087NY · Installation of Cu-Sonde Meteorological Measurement/system models CS-1A or CS-1B; and installation of Cu-Sonde Model CS-1B-RF with AIRDAT-9600.
- Holder
- Aventech Research Inc
- Status date
SA00215NY · Installation of CAVU Model AM100 AVMIX engine fuel/air mixture setting system.
- Holder
- CAVU Products Limited
- Status date
SA312CH · Installation of shoulder harness and crotch straps.
- Holder
- Hooker Custom Harness
- Status date
SA5656NM · Installation of burglar alarm system.
- Holder
- Thompson Harold S
- Status date
SA5926NM · Installation of manifold pressure instrument.
- Holder
- Electronics International
- Status date
SA1626NM · Installation of Electronics Int'l Digital EGT/CHT Instruments and accessories. (201 Series)
- Holder
- Electronics International
- Status date
SA2844CE · Installation of a plastic cap enclosure over the anti-collision strobe light system.
- Holder
- Air Transport Inc
- Status date
SA1768GL · Install Aero Fabricators shoulder harness and seat belt assembly.
- Holder
- Aero Fabricators Co
- Status date
SA4094NM · Installation of Oilamatic engine preoiler.
- Holder
- Oilamatic Inc
- Status date
SA2350NM · Installation of Electronics International Inc digital carburetor/outside air temperature gauges
- Holder
- Electronics International
- Status date
SA4302NM · Installation of Electronics Int'l digital automatic engine analyzer.
- Holder
- Electronics International
- Status date
SA1358GL · Install Model R2800 retractable skis.
- Holder
- Aero Ski Manufacturing Co Inc
- Status date
SA3862NM · Installation of Electronics International Primary TIT/EGT/CHT instruments, remote switches and associated accessories.
- Holder
- Electronics International
- Status date
SA2190NM · Installation of electronics International Digital Volt/Amp Gauges and Accessories.
- Holder
- Electronics International
- Status date
SA1351WE · Replace existing fabric on wings, fuselage, empennage, and/or control surfaces, with Ceconite101 material. (262A Series -12)
- Holder
- Ceconite Inc
- Status date
SA18CE · Installation of Pee-Kay Model 1800 or B1800 (TSO-C27-2) seaplane floats.
- Holder
- DeVore Aviation Corporation of America, a New Mexico Corporation
- Status date
SA3-523 · Install four auxiliary and one ventral fin and Pee-Kay Model1800 floats.
- Holder
- DeVore Aviation Corporation of America, a New Mexico Corporation
- Status date
SA4-1210 · Installation of Eonnex cover on aircraft surfaces.
- Holder
- Ceconite, Inc
- Status date
SA308EA · Installation of carburetor ice detection system 105AP in single and twin engine aircraft and single engine helicopters powered by Continental, Franklin, and Lycoming type engines equipped with Marvel-Schebler MA-2, MA-3, MA-4, MA-4-5, MA-6 and HA-6 series carburetors. (Normal,Utility and Acrobatic Category airplanes and helicopters equipped with engines and carburetors as described.)
- Holder
- Alfred R Puccinelli
- Status date
SA283AL · Installation of Hartzell HC 82XL-1, -2, or -6 propeller hub with 7636D-4 blades or HC-C2YL-1B hub with 76634 blades and appropriate Woodward governor.
- Holder
- Bachner's Aircraft Service
- Status date
SA323AL · Installation of McCauley 1A175- GM8042 propeller.
- Holder
- Matanuska Air Svc, Inc
- Status date
SA124EA · Shur-Vent fuel tank filler cap.
- Holder
- Alfred R Puccinelli
- Status date
Sources
Source: FAA Dynamic Regulatory System, as of Nov 23, 2026.